I
CONTENTS
CHAPTER 1 INTRODUCTION TO BASIC FEATURES OF UNITS
................................................................. 7
2 INTERNAL PIPING DESIGN OF THE UNITS
.......................................................................................... 8
6 BASIC REQUIREMENT FOR PIPE CONNECTION
............................................................................. 17
7 PRECAUTIONS ON REFRIGERANT LEAKAGE
................................................................................. 19
PART 1 ENGINEERING INSTALLATION PREPARATION
..................................................................... 23
2 IMPORTANCE OF INSTALLATION ENGINEERING
............................................................................ 23
3 COOPERATION BETWEEN DIFFERENT PROFESSIONS
................................................................ 24
4 ONSITE REVIEW OF DESIGN DRAWING
............................................................................................. 27
5 CONSTRUCTION ORGANIZATION PROCESS
.................................................................................... 28
1 REQUIREMENT FOR SELECTING CONSTRUCTION MATERIALS
................................................ 29
2 REQUIREMENT FOR SELECTING MAJOR MATERIALS
.................................................................. 29
PART 3 INSTALLATION SPACE REQUIREMENTS
................................................................................ 31
1 PLACE SELECTION FOR INSTALLING ODU
...................................................................................... 31
2 ODU DIMENSIONS AND INSTALLATION HOLE SIZE
....................................................................... 31
PART 4 REQUIREMENTS ON FOUNDATION INSTALLATION
............................................................ 39
3 VIBRATION REDUCTIONS FOR ODU
1 SCHEMATIC DIAGRAM OF PIPING CONNECTION
........................................................................... 41
2 SCHEMATIC DIAGRAM OF PIPING SEQUENCE
................................................................................ 41
3 ALLOWABLE PIPE LENGTH AND DROP HEIGHT AMONG IDU AND ODU
................................. 42
4 CONNECTION PIPE AMONG ODU MODULES
.................................................................................... 43
5 SIZE REQUIRMENT FOR FITTING PIPE AND BRANCH
................................................................... 44
PART 6 PIPE INSTALLATION AND INSULATION
................................................................................... 49
1 PIPE INSTALLATION FOR THE COOLING SYSTEM
......................................................................... 49
2 PIPE INSTALLATIONS FOR THE CONDENSATE WATER SYSTEM
.............................................. 57
PART 7 ELECTRIC AND CONTROLLER INSTALLATION
.................................................................... 62
2 INSTALLATION OF THE POWER CABLE
............................................................................................. 63
3 INSTALLATION OF THE COMMUNICATION SYSTEM
....................................................................... 67
PART 8 VACUUMIZATION AND DESICCATION FOR THE REFRIGERANT SYSTEM
2 VACUUMIZATION AND DESICCATION FOR THE SYSTEM
............................................................. 78
1 CALCULATION METHOD FOR PERFUSING REFRIGERANT
......................................................... 80
Содержание Ultra Heat GMV-VQ72W/A-F
Страница 1: ...Ultra Heat GMV Multi VRF TECHNICAL SERVICE MANUAL R410A Heat Recovery Series ...
Страница 26: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial INSTALLATION 22 CHAPTER 2 INSTALLATION ...
Страница 30: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial INSTALLATION 26 ...
Страница 73: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial INSTALLATION 69 ...
Страница 120: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 116 CHAPTER 4 MAINTENANCE ...
Страница 135: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 131 ...
Страница 136: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 132 2 System high pressure protection E1 ...
Страница 137: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 133 3 System low pressure protection E3 ...
Страница 167: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 163 PFC board Drive board ...
Страница 203: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 199 5 4 NCHS4B U ...
Страница 205: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 201 5 5 NCHS8B U ...
Страница 207: ...Jf00303410 ...