Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial COMMISSIONING OPERATION
86
CHAPTER 3 COMMISSIONING OPERATION
PART 1 SECURITY REQUIREMENTS
1 PRECAUTIONS FOR CONSTRUCTION
All commissioning and maintenance personnel must learn and strictly comply with construction
security specifications. Security measures must be taken especially for outdoor operations.
Workers of special types of labor, such as refrigerating engineers, electricians, and welders, must
have professional certificates. No worker is allowed to do another type of labor.
The equipment must be powered off before relevant operations, and other security requirements
should be strictly complied with.
All installation and maintenance operations must comply with design requirements of this product and
national and local security operation requirements. Rule-breaking operations are prohibited.
2 PRECAUTIONS FOR THE USE OF REFRIGERANTS
The Ultra Heat GMV serial unit is a refrigerating system of R410A working substances. Pay
attention to the following points:
The refrigerating system of R410A working substances has a higher working pressure than that of R22
working substances. The working pressure of the former is 1.6 times than that of the latter.
The refrigerating system of R410A working substances uses thicker-walled copper tubes than that of
R22 working substances. Adopt copper tubes with appropriate wall thickness.
R410A working substances are azeotropic mixture working substances. Refrigerants must be
appended in the form of liquid.
3 FUNCTION SETTINGS OF ODUS
Function application of ODUs consists of function DIP switch settings and function button settings,
including special engineering requirements.
Содержание Ultra Heat GMV-VQ72W/A-F
Страница 1: ...Ultra Heat GMV Multi VRF TECHNICAL SERVICE MANUAL R410A Heat Recovery Series ...
Страница 26: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial INSTALLATION 22 CHAPTER 2 INSTALLATION ...
Страница 30: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial INSTALLATION 26 ...
Страница 73: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial INSTALLATION 69 ...
Страница 120: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 116 CHAPTER 4 MAINTENANCE ...
Страница 135: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 131 ...
Страница 136: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 132 2 System high pressure protection E1 ...
Страница 137: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 133 3 System low pressure protection E3 ...
Страница 167: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 163 PFC board Drive board ...
Страница 203: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 199 5 4 NCHS4B U ...
Страница 205: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 201 5 5 NCHS8B U ...
Страница 207: ...Jf00303410 ...