Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial INSTALLATION
25
placed in the ceiling, if possible.
(2) A place should be reserved for the ODU base to prevent the waterproof layer or insulating layer
on the roof from being damaged in later phase of installation.
(3) At places on walls or floors where pipes need to go through, holes or casing should be
preserved. If the pipe needs to go through a bearing beam, a steel casing must be prepared.
3.2 Requirements for Cooperation with Decoration Engineering
The air conditioning installation should not damage the bearing structure or the decorative style. Air
conditioning pipes should be laid out along the bottom of the beam as possible. If pipes meet one
another at the same elevation, process based on the following principles:
(1) Drain pipes enjoy the highest priority. Air ducts and pressure pipes should leave places for
gravity pipes.
(2) Air ducts and small pipes should leave places for major pipes.
3.3 Requirements for Cooperation with Electric
After the capacity of air conditioning unit is determined, check the following aspects with relevant
electric design personnel:
(1) Whether the electrical load is designed based on the requirement of the air conditioning unit;
(2) Whether the power cable and circuit breaker meet the unit requirement and abide by relevant
national safety regulations;
(3) Whether the regional power supply quality (including voltage fluctuation and interference noise)
meet the international requirement;
(4) Any nonconformity must be resolved through coordination.
Содержание Ultra Heat GMV-VQ72W/A-F
Страница 1: ...Ultra Heat GMV Multi VRF TECHNICAL SERVICE MANUAL R410A Heat Recovery Series ...
Страница 26: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial INSTALLATION 22 CHAPTER 2 INSTALLATION ...
Страница 30: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial INSTALLATION 26 ...
Страница 73: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial INSTALLATION 69 ...
Страница 120: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 116 CHAPTER 4 MAINTENANCE ...
Страница 135: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 131 ...
Страница 136: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 132 2 System high pressure protection E1 ...
Страница 137: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 133 3 System low pressure protection E3 ...
Страница 167: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 163 PFC board Drive board ...
Страница 203: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 199 5 4 NCHS4B U ...
Страница 205: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 201 5 5 NCHS8B U ...
Страница 207: ...Jf00303410 ...