Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial INSTALLATION
24
9
The refrigerant pipe leaks.
Insufficient refrigerant circulating in the system decreases the cooling
performance of the air conditioner. Long-term operation under such
circumstance may cause an overheating compressor or even damage the
compressor.
10
Water drainage from the condensate
water pipe is not smooth.
Residual water in IDUs can affect the normal operation of the system. The
possible water leakage can damage the IDU's decoration.
11
The ratio of slop for condensate water
pipe is insufficient or the condensate
water pipe is incorrectly connected.
Reverse slop or inconsistent connection of condensate water pipe can
hinder the smooth drainage and cause leakage of the IDU.
12
The air channel is improperly fixed.
The air channel will deform; vibration and noise occur during unit
operating.
13
The guide vane of air channel is not
reasonably manufactured.
Uneven air quantity allocation reduces the overall performance of the air
conditioner.
14
The refrigerant pipe or condensate
water pipe does not meet the
insulation requirement.
Water cans easily condensate and drips to damage the indoor decoration,
or even trigger the protection mode of system due to overheating
operation.
15
The installation space for IDU is
insufficient.
Since there is a lack of space for maintenance and checking, indoor
decoration might need to be damaged during such operation.
16
The IDU or the location of the air
outlet or return air inlet is not designed
reasonably.
The air outlet or return air inlet may be short-circuited, thus affecting the
air conditioning performance.
17
The ODU is improperly installed.
The ODU is difficult to be maintained; unit exhaust is not smooth, which
reduces the heat exchanging performance or even prevent the system
from normal operation; in addition, the cold and hot air for heat exchange
and the noise may annoy people in surrounding areas.
18
Power cables are incorrectly provided.
Unit components may be damaged and potential safety hazard may occur.
19
Control communication cables are
incorrectly provided or improperly
connected.
The normal communication in the system fails or the control over IDUs
and ODUs turn in a mess.
20
Control communication cables are not
properly protected.
The communication cables are short-circuited or disconnected, and the
unit cannot be started up due to communication failure.
Understand the special requirement (if any) for unit installation before implementation to ensure
installation quality. Relevant installers must have corresponding engineering construction qualifications.
Special type operators involved in the engineering implementation, such as welders, electricians,
and refrigeration mechanics must have relevant operating licenses and are accredited with vocational
qualification certification.
3 COOPERATION BETWEEN DIFFERENT PROFESSIONS
A quality installation of air conditioning engineering depends on careful organization and close
cooperation between different professions such as architecture, structure, electric, water supply and
drainage, fire-fighting, and decoration. Pipes must be laid in places away from any automatic spray head
for fire-fighting, and must be reasonably arranged to ensure that the pipes fit the electric, luminaries, and
decoration.
3.1 Requirements for Cooperation with Civil Engineering
(1) The riser should be installed in the air conditioning tube well, and the horizontal pipe should be
Содержание Ultra Heat GMV-VQ72W/A-F
Страница 1: ...Ultra Heat GMV Multi VRF TECHNICAL SERVICE MANUAL R410A Heat Recovery Series ...
Страница 26: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial INSTALLATION 22 CHAPTER 2 INSTALLATION ...
Страница 30: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial INSTALLATION 26 ...
Страница 73: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial INSTALLATION 69 ...
Страница 120: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 116 CHAPTER 4 MAINTENANCE ...
Страница 135: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 131 ...
Страница 136: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 132 2 System high pressure protection E1 ...
Страница 137: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 133 3 System low pressure protection E3 ...
Страница 167: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 163 PFC board Drive board ...
Страница 203: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 199 5 4 NCHS4B U ...
Страница 205: ...Ultra Heat GMV VRF Technical Service Manual_Heat Recovery Serial MAINTENANCE 201 5 5 NCHS8B U ...
Страница 207: ...Jf00303410 ...