
Great Plains Manufacturing, Inc.
Operating Instructions
29
2019-03-14
195-067M
6. Rotate cylinder lock channels over rods on the two
transport lift cylinders and the front box lift cylinder.
Note: Bumpers hold the transport lift cylinder lock
channels in place temporarily. The channels will
remain in position when cylinders settle against
channels.
7. Slowly reverse the Transport Lift circuit lever until all
three lock channels are resting firmly on the rod ends
of the transport lift and box lift cylinders. Set circuit
lever to off.
The drill is now ready for the pre-transport checklist.
Figure 22
Front Box Lift Cylinder Lock
18959