2S-2600/F/HD/HDF
Maintenance and Lubrication
Great Plains
| 195-440M | 2019-05-03
75
Link Tube
The link tube controls folding height of outer end of drill
box. If a drill box does not catch in folding latch when
folding, adjust link length to lower or raise end of box.
1. Unfold and lower drill.
2. Pull upper pin from link clevis .
3. Unlock jam nut .
4. Thread clevis in or out to lengthen or shorten link.
5. Replace pin and tighten nut.
Toolbar Height
Toolbar height above ground level is factory set
and normally does not require adjustment. If you tear
down the drill for repair, or if the toolbar is visibly not
level, spacer washers on vertical pivot pins allow for a
small amount of tool bar-height adjustment.
To check toolbar height, park drill on a level surface, and
check for correct tire inflation. Measure from ground to
horizontal pivot pin . If dimension on either side of drill
varies more than
1
4
inch (6.4mm), adjust toolbar height.
To adjust toolbar height, reposition spacer washers .
First lower openers and set enough opener down
pressure to help balance frame. Raise toolbar by
removing spacer washers from top of the vertical pivot
and placing them on bottom side of pivot. Lower toolbar
by removing spacer washers from bottom of vertical pivot
and placing them on top of pivot.
Figure 81
Link Tube Adjustment
17307
1
2
3
Figure 82
Toolbar Height
17306
3
1
2