Instrction manual
Installation
15
6.2.2
Attaching the guide rails
Legend
Pos. Name
Pos.
Name
A
Tensioning thumb-wheel
E
Ruler scale (0)
B
Tension bar
F
Set Separation distance
C
Separation bar securing screw
G
Securing chain
D
Separation bar
1.
Slide the separation bar (D) into the front of the left hand guide rail, align the front edge of
the guide rail with ‘0’ on the ruler scale (E) and secure it in place by tightening the
thumbscrew (C).
2.
Slide the other end of the separation bar into the front of the right hand guide rail, align
the front edge of the guide rail to the required separation distance (obtained from the
Portaflow instrument) on the ruler (F), then secure it in place by tightening the
thumbscrew.
If magnetic guide rails are used on steel pipes then only the location at 45° on the pipe
apply on the next two sections.
3.
On each guide rail, attach one end of a securing chain to a hook on the tensioning bar (B),
wrap the chain around the pipe (G) and then attach it to the hook on the other end of the
tensioning bar whilst keeping the chain as tight as possible.
4.
Rotate the complete guide rail assembly so that it is approximately 45° with respect to the
top of the pipe. Then tighten the chain by turning the tensioning thumb-wheel (A) on each
guide block until the assembly is securely attached to the pipe.
NOTICE
Содержание PORTAFLOW 330
Страница 1: ...Instruction manual PORTAFLOW 330 Portable Ultrasonic Flowmeter GF Piping Systems...
Страница 2: ......
Страница 54: ...Notes...
Страница 55: ...Notes...