3
URB 60 - Installation & Operating Manual -
819699-00
Contents
Starting up for the first time .........................................................................................................................27
Setup Wizard settings ...............................................................................................................................27
Bringing the boiler, feedwater/condensate tank into service (Group 1..3) .................................................28
Home screen ..................................................................................................................................................29
Alarms and error messages ..........................................................................................................................31
Opening the Alarm History - the complete list of all alarms .......................................................................32
Opening the alarm and error list automatically ..........................................................................................32
System settings .............................................................................................................................................33
Viewing CAN bus nodes.................................................................................................................................34
Setting the date/time.....................................................................................................................................35
Password .......................................................................................................................................................35
Network settings ...........................................................................................................................................36
Remote maintenance/software.....................................................................................................................36
Device settings ..............................................................................................................................................37
System information .......................................................................................................................................39
Selecting the language ..................................................................................................................................40
Configuring the level controller ....................................................................................................................41
Testing the relays of the connected level controller ...................................................................................42
Pump control ............................................................................................................................................42
Setting manual control or the control point for manual pump operation .....................................................43
Switching actuator operation between automatic and manual ...................................................................43
Valve calibration in manual mode when a feedback potentiometer is connected to the NRR 2-60 ............44
Calibrating the boiler level ........................................................................................................................45
Setting the level controller ........................................................................................................................46
Guide to setting control parameters ..........................................................................................................46
Setting the level controller for 3-component control ..................................................................................47
Configuring the conductivity controller ........................................................................................................48
Standby mode ..........................................................................................................................................49
Testing the relays of the connected conductivity controller ........................................................................49
Continuous blowdown valve ......................................................................................................................50
Continuous blowdown valve - Calibrating the feedback potentiometer for the valve position display .........51
Setting the intermittent blowdown and automatic flush function ...............................................................52
Setting a correction factor and temperature compensation for the current conductivity reading ................53
Setting safety parameters .........................................................................................................................54
Setting the control parameters ..................................................................................................................55
Guide to setting control parameters ..........................................................................................................55
Содержание URB 60
Страница 1: ...Original Installation Operating Manual Visual Display and Operating Unit URB 60 819699 00 E N English ...
Страница 65: ...65 URB 60 Installation Operating Manual 819699 00 For your notes ...
Страница 66: ...66 URB 60 Installation Operating Manual 819699 00 ...
Страница 67: ...67 URB 60 Installation Operating Manual 819699 00 ...