13
URB 60 - Installation & Operating Manual -
819699-00
Required personnel qualifications
Activity
Personnel
Integration in control system
Specialist staff
Plant designer
Installation/electrical connection/bring-
ing into service
Specialist staff
Electrician/installer
The equipment may only be installed, wired
and brought into service by qualified and
competent staff.
Operation
Boiler service technician
Staff trained by the
plant operator
Maintenance work
Specialist staff
Electrician
Maintenance and setup work may only be
performed by authorised staff who have
undergone specific training.
Setup work
Specialist staff
Plant construction
Fig. 1
Notes on product liability
We the manufacturer cannot accept any liability for damages resulting from improper use of the equip-
ment.
Содержание URB 60
Страница 1: ...Original Installation Operating Manual Visual Display and Operating Unit URB 60 819699 00 E N English ...
Страница 65: ...65 URB 60 Installation Operating Manual 819699 00 For your notes ...
Страница 66: ...66 URB 60 Installation Operating Manual 819699 00 ...
Страница 67: ...67 URB 60 Installation Operating Manual 819699 00 ...