51
URB 60 - Installation & Operating Manual -
819699-00
Configuring the conductivity controller
Continuous blowdown valve - Calibrating the feedback potentiometer for the valve position display
If a feedback potentiometer is connected to
the LRR 1-60 conductivity controller, it must be
calibrated.
Read the instructions for connecting a
feedback potentiometer in the Installa-
tion & Operating Manual of the
LRR 1-60 conductivity controller.
Performing calibration:
Calibration at 0 %
1.
Tap the “Hand” (= Manual) button.
2.
Enter 0 % in the “Manual” input field.
The continuous blowdown valve moves to the
set position.
3.
When the valve position
is reached, confirm it.
Calibration at 100 %
4.
Enter 100% in the “Manual” input field.
The continuous blowdown valve moves to the
set position.
5.
When the valve position
is reached, confirm it.
Содержание URB 60
Страница 1: ...Original Installation Operating Manual Visual Display and Operating Unit URB 60 819699 00 E N English ...
Страница 65: ...65 URB 60 Installation Operating Manual 819699 00 For your notes ...
Страница 66: ...66 URB 60 Installation Operating Manual 819699 00 ...
Страница 67: ...67 URB 60 Installation Operating Manual 819699 00 ...