![Gerber Dimension 200 Скачать руководство пользователя страница 66](http://html.mh-extra.com/html/gerber/dimension-200/dimension-200_manual_2216273066.webp)
66
Dimension 200
Preliminary Preparation
Before preparing the
Dimension 200
for operation, complete the
following steps:
1.
Turn OFF the electrical box power switch.
2.
Unplug the router motor power cable.
3.
Raise the router motor by manually turning the Z axis
adjustment knob, located on top of the Z axis motor.
4.
Adjust the feet of the Dimension 200 to a higher or lower
position to ensure that the router table is level.
Содержание Dimension 200
Страница 10: ...10 Dimension 200 Note The contents of your tool kit may vary from the photograph ...
Страница 12: ...12 Dimension 200 LEG ASSEMBLY ...
Страница 34: ......
Страница 64: ......
Страница 72: ...72 Dimension 200 6 Be sure that the collet and spindle are clean and undamaged ...
Страница 94: ......
Страница 110: ...Weekly Cleaning 100 Z Axis Ways 100 X and Y Axis Ways 101 Electrical Box Air Filter 101 Router Motor Lubrication 102 ...
Страница 111: ......