40
Dimension 200
Power Switch
The main power switch is located on the front of the electrical
box, encircled by a yellow border. It switches power on and off at
the ARC station. Turn the power on or off here for normal use.
Before turning on the main power switch, make sure that the ARC
station power supply is connected to both the ARC station and
the appropriate grounded outlet on the back of the electrical box.
Emergency Power Switch
The main power switch on the front of the electrical box
also
serves as the emergency power switch. Turn off power here for
emergencies.
ROUTER MOTOR POWER SWITCH
The router motor power switch turns the motor on and off. The
router motor has a thumb switch on the top labeled
ON
and
OFF
.
WARNING: The router motor must be OFF during vacuum
shroud installation, mist coolant installation, tool changing, Z
axis initialization, or when performing any other functions
around the cutter.
CAUTION: The router motor switch should be off until the job
is ready to begin. DO NOT turn the router motor on when pen
plotting.
1.
When the job is ready to begin, turn ON the router motor
power switch.
2.
Press the START key to start the job.
Note: There is a delay before the tool begins cutting. This delay gives
the router motor time to come up to full speed before cutting begins, and
the operator time to stop the job if the router motor is not
ON
.
Содержание Dimension 200
Страница 10: ...10 Dimension 200 Note The contents of your tool kit may vary from the photograph ...
Страница 12: ...12 Dimension 200 LEG ASSEMBLY ...
Страница 34: ......
Страница 64: ......
Страница 72: ...72 Dimension 200 6 Be sure that the collet and spindle are clean and undamaged ...
Страница 94: ......
Страница 110: ...Weekly Cleaning 100 Z Axis Ways 100 X and Y Axis Ways 101 Electrical Box Air Filter 101 Router Motor Lubrication 102 ...
Страница 111: ......