65
System Preparation and Use
This section discusses the procedures to follow before and during
the operation of the
Dimension 200
:
Preliminary preparation
Router motor installation/removal
Tool selection, installation, removal, and replacement
Table mat milling and engraving
Material selection and preparation
Workpiece attachment to sacrificial material
Workpiece mounting to the router table
Chip removal system use
Mist coolant system use
Step height gage use
Содержание Dimension 200
Страница 10: ...10 Dimension 200 Note The contents of your tool kit may vary from the photograph ...
Страница 12: ...12 Dimension 200 LEG ASSEMBLY ...
Страница 34: ......
Страница 64: ......
Страница 72: ...72 Dimension 200 6 Be sure that the collet and spindle are clean and undamaged ...
Страница 94: ......
Страница 110: ...Weekly Cleaning 100 Z Axis Ways 100 X and Y Axis Ways 101 Electrical Box Air Filter 101 Router Motor Lubrication 102 ...
Страница 111: ......