3
Router Requirements
This section discusses the work space, equipment, and electrical
requirements for the Dimension 200 router system.
Work Space Requirements
Warning: THERE MUST BE SUFFICIENT SPACE PROVIDED
IN THE PRODUCTION AREA AROUND THE ROUTER FOR
MATERIAL STORAGE AND SAFE ACCESS FROM ALL
SIDES.
A 3-ft. clearance on all sides of the router stand is the
recommended minimum work area. In addition, all equipment
should be kept reasonably close together. The T-Vac
blower
must be located close to the rear of the table.
CAUTION: Do not place a router in a damp work area. The
operating environment should fall within a temperature range
between 32 - 99
°°°°
F (0 and 37
o
C) and within a relative humidity
range between 0 and 70%.
Equipment Requirements
ROUTER STAND
A 48 in. square table or stand (with 3-ft. clearance on all sides, or
more if the paneling feature is used) is needed. If the stand is not
used, the table must be a heavy duty table able to support 300 lbs.
ELECTRICAL BOX
Gerber recommends placing the electrical box on the table beside
the unit or under the table. The power switch must be easily
accessible. Do not set the box directly on concrete floors because
of condensation potential. The electrical box must also be
protected from any coolant.
Содержание Dimension 200
Страница 10: ...10 Dimension 200 Note The contents of your tool kit may vary from the photograph ...
Страница 12: ...12 Dimension 200 LEG ASSEMBLY ...
Страница 34: ......
Страница 64: ......
Страница 72: ...72 Dimension 200 6 Be sure that the collet and spindle are clean and undamaged ...
Страница 94: ......
Страница 110: ...Weekly Cleaning 100 Z Axis Ways 100 X and Y Axis Ways 101 Electrical Box Air Filter 101 Router Motor Lubrication 102 ...
Страница 111: ......