(1) Periodical checking table:
1.[
○
] mark indicates periodical checking
2.[
*
] indicates changing the parts
Checking period
Check item
Gen-
eral
che-
cking
First
Month
Or
Initial
200mile
Home
Per6 per12
Months months
Or or
3000mile 6000mile
Office
Per1 per3 per12
Months months months
Or or or
600
mile
1500mile 6000mile
Judgement
standard
Remark
Loose,swing
○
○
○
○
○
○
A Suspension
Steering
Handlebar performance
○
○
○
○
○
○
Suspension: turning angle
○
○
a.cracked
○
○
○
○
○
b.shaft fixed
condition
○
○
○
○
○
From steering
column
Front fork
c.shaft:loose
○
○
○
B: Brake
a.clearance
○
○
○
○
○
○
Clearance:
Front:10-20mm
Rear :10-20mm
Check
from
Steering
column
Brake lever
b.movement
ofbrake
○
○
○
○
○
○
○
Loose or damage
○
○
○
○
○
○
brake
Brake cables
change
※
per 2 years
Brake cam Worn out
○
a.
drum and plate
clearance between
○
○
○
○
○
b.brake shoe and br
ake plate worn out
○
○
○
Brake drum
And brake
shoe
c.brake drum
worn and
damage
○
○
Standard dia:
Rear:130.0mm
Limit of use:
Rear:131mm
mark type
front axle:dam-
age or cracked
○
rear axle:worn
or damage
○
Check
rear
Axle
Wheel pressure
○
○
○
○
○
○
○
Unit:kg/c
㎡
:
Front:1.5
Rear :1.75
Wheel cracked
Or damage
○
○
○
○
○
○
Wheel gap and
worn
○
○
○
○
○
○
Gaplimit:
Front
wheel:0.8mm
rea wheel:0.8mm
Wheel surface
Or other metals
○
○
○
○
○
○
Axle nut screw
Pin tightness
○
○
○
○
○
Front axle screw
torque
5.0~6.0kg-m
rear axle torque
11..0~13.0kg-m
Nut
location
wheel
Wheel rim swi-
Ngness and da-
Mage condition
○
○
○
○
○
Swingness ofr front
Rear wheel rim.
Vertical
swing:2mmbelow
Horizpmta;”:2mm
below
26
Содержание Buddy 170
Страница 1: ......
Страница 11: ...B Chassis Steel ball steering item Front brake fluid Front brake cam 7...
Страница 15: ...5 Wiring diagram 11...
Страница 43: ...1 Lubrication System Lubrication System Diagram PA150 39...
Страница 52: ...3 Engine dismantling A Dismantling engine B lnstalling engine 48...
Страница 63: ...5 Cylinder head and valve A Trouble shooting B The operation data information C Dismantling and installing 59...
Страница 73: ...7 A C Generator A Dismantling AC generator B Installing AC generator 69...
Страница 99: ...F Rear damper 1 Rear damper disassembling diagram 95...
Страница 100: ...5 Engine Management System PGO 2nd stage EMS 1 PGO 2nd stage EMS structure 2 EMS units 3 EMS diagnostic 96...
Страница 132: ...4 Starting system 1 Starting wiring 128...
Страница 134: ...5 Starting clutch Explosive diagram 130...
Страница 137: ...133...