2.Testing the recharging performance
This test needs to be done under the
Battery has been recharged completely
a. This test needs to be done after
engine is warm-up.
And take off the luggage case
Firstly.
b. Disconnect the orange cable of
regulator.
c. Open the fuse box to remove the
white cable
d. Connect currency meter between red/
white cable fuse.
While testing, the red wire cable must not touch the frame.
d. Set the headlamp switch at “OFF” , engine rotation is at 2000 rpm while testing.
Then increase the rpm slowly.
Head Lamp Switch
Recharging rpm
2,500rpm
6,000rpm
OFF (DAY)
Under2,000upm
0.6A(MIN)
1.5A(MIN)
ON (NIGHT)
Under2,000upm
0.6A(MIN)
1.5A(MIN)
e. If the testing result does not match standard value, check the regulator.
125
Содержание Buddy 170
Страница 1: ......
Страница 11: ...B Chassis Steel ball steering item Front brake fluid Front brake cam 7...
Страница 15: ...5 Wiring diagram 11...
Страница 43: ...1 Lubrication System Lubrication System Diagram PA150 39...
Страница 52: ...3 Engine dismantling A Dismantling engine B lnstalling engine 48...
Страница 63: ...5 Cylinder head and valve A Trouble shooting B The operation data information C Dismantling and installing 59...
Страница 73: ...7 A C Generator A Dismantling AC generator B Installing AC generator 69...
Страница 99: ...F Rear damper 1 Rear damper disassembling diagram 95...
Страница 100: ...5 Engine Management System PGO 2nd stage EMS 1 PGO 2nd stage EMS structure 2 EMS units 3 EMS diagnostic 96...
Страница 132: ...4 Starting system 1 Starting wiring 128...
Страница 134: ...5 Starting clutch Explosive diagram 130...
Страница 137: ...133...