Checking period
Check item
Gen-
eral
che-
cking
First
Month
Or
Initial
200mile
Home
Per6 per12
Months months
Or or
3000mile 6000mile
Office
Per1 per3 per12
Months months months
Or or or
600
mile
1500mile 6000mile
Judgement
standard
Remark
Wheel Front
Bearing of axle,
Looseness
○
○
○
○
○
○
Rear
○
○
Rear damper spring
cracked
○
○
○
○
○
○
ass’ part loose
or damage
○
○
○
○
○
Connecting part
Loose
○
○
Bracket loose or
Damage
○
○
Suspen-
sion
Connecting
Part loose
○
○
Oil leakage
○
○
○
Cracked
○
○
○
Damper
damper
assy's part,
Loose
○
○
○
○
○
○
○
○
Clutch and
Change
Speed
mechanism
○
○
○
○
○
Power
Transmi-
ssion Supply
grease
○
○
○
○
○
※
per 2 year
Ignition
○
○
○
○
○
Clearance:
0.6~0.7mm
NGK:C7RHSA
OR SAME
SPEC
Start
mechanis
m
Starting
Motorpinion
Meshing
○
○
○
wiring Recharge
Effect
○
○
○
○
○
Electroly-
Te quantit
○
○
○
○
○
Level between
“UPPER” AND
“LOWER”
battery Electroly-
Te s. gra-
vity
○
○
○
WHEN 20
℃
SPECIFIC
GRAVITY:
1.270~1.290
Electric
Install-
Ment
wire
circuit
Wire conn-
ecting
Loose or
cracked
○
○
○
○
○
27
Содержание Buddy 170
Страница 1: ......
Страница 11: ...B Chassis Steel ball steering item Front brake fluid Front brake cam 7...
Страница 15: ...5 Wiring diagram 11...
Страница 43: ...1 Lubrication System Lubrication System Diagram PA150 39...
Страница 52: ...3 Engine dismantling A Dismantling engine B lnstalling engine 48...
Страница 63: ...5 Cylinder head and valve A Trouble shooting B The operation data information C Dismantling and installing 59...
Страница 73: ...7 A C Generator A Dismantling AC generator B Installing AC generator 69...
Страница 99: ...F Rear damper 1 Rear damper disassembling diagram 95...
Страница 100: ...5 Engine Management System PGO 2nd stage EMS 1 PGO 2nd stage EMS structure 2 EMS units 3 EMS diagnostic 96...
Страница 132: ...4 Starting system 1 Starting wiring 128...
Страница 134: ...5 Starting clutch Explosive diagram 130...
Страница 137: ...133...