Valve opened
Fig.16:
Initiator bracket side valve
Fig.17:
Initiator bracket main valve
Carry out the following steps:
1.
Bring the valve to the upper end position
®
Spring-opening valve (NO)
Pressurize the actuator with compressed air, max. 8 bar.
®
Spring-closing valve (NC)
Depressurise the actuator.
2.
Release the lock nut (3) and unscrew the nuts (4) if required.
3.
Position the centre axis of the initiator (2.1) over the switching edge (6).
4.
Set distance (a) between the initiator (2.1) and the head of the switch bar (5)
to 0.5 to 1.5 mm using the nut (4), so that the LED (2.2) lights up.
5.
Tighten the lock nut (3).
6.
Charge and vent the actuator to check the feedback of the upper end position.
®
The LED (2.2) is lit in the upper end position and goes out as soon as the
valve disk is lowered.
®
Done
Assembly and installation
430BAL013307EN_8
36
04.08.2022
Содержание D-tec D
Страница 66: ...Fig 39 Maintenance Assembling the valve 430BAL013307EN_8 66 04 08 2022...
Страница 69: ...Fig 41 Maintenance Assembling the valve 430BAL013307EN_8 04 08 2022 69...
Страница 85: ...Fig 55 Housing Parts list D tec double chamber valve type D DV 430BAL013307EN_8 04 08 2022 85...
Страница 91: ...Fig 58 hard seal Parts list D tec valve insert D DV SV NC NO 430BAL013307EN_8 04 08 2022 91...
Страница 95: ...15 Parts list lift actuator _LB DV Fig 59 Parts list lift actuator _LB DV 430BAL013307EN_8 04 08 2022 95...
Страница 99: ...Fig 61 Dimension sheet double chamber valve type D DV 430BAL013307EN_8 04 08 2022 99...
Страница 105: ...Appendix 430BAL013307EN_8 04 08 2022 105...
Страница 106: ......