Chapter 12. Diagnostics
GFK-2224Q
January 2017
239
Accelerated EGD Consumption Can Interfere with EGD Production
Consumed EGD exchanges received from the network normally receive accelerated processing for increased
overall EGD performance. This accelerated processing can preempt EGD production activity, possibly delaying
transmission of produced exchanges to the network. Such delay varies with network loading and the volume of
consumed exchanges. In applications requiring minimal produced exchange timing variability, the consumed
exchange acceleration may be disabled via the “gc_accel” AUP parameter. (See Appendix A for details of the
“gc_accel” parameter.) Under extreme network load, accelerated processing of the incoming EGD samples
may consume so much processing time that the watchdog timer for the network interface expires and the
network interface is reset.
Channels Operation Depends Upon PLC Input Scanning
Communication channels operation always includes updating the Channel Status Bits (located within the
Ethernet Status data) into PLC memory, which occurs when the PLC scans inputs from the Ethernet module. At
least one PLC input scan must occur for each data transfer on a channel, so the channel can run no faster than
the PLC scans the Ethernet Status data. When the Ethernet interface is configured to use an I/O Scan Set than
runs more slowly than the PLC sweep, each channel must wait until the next time that its scan set runs to
transfer its Channel Status bits. This can reduce channels performance.
If the Ethernet interface is configured to use an inactive I/O Scan Set, the Channels Status bits will not be
transferred and channel operations will not complete.
Содержание PACSystems RX7i
Страница 45: ......
Страница 54: ...Chapter 4 Configuration GFK 2224Q January 2017 41 Figure 18 CPE400 Advanced Ethernet Configuration LAN1 LAN 2 ...
Страница 80: ...Chapter 4 Configuration GFK 2224Q January 2017 67 ...
Страница 81: ......
Страница 122: ...Chapter 6 Programming EGD Commands GFK 2224Q January 2017 109 ...
Страница 142: ...Chapter 7 Programming SRTP Channel Commands GFK 2224Q January 2017 129 Figure 51 Sample Ladder Logic for COMMREQ ...
Страница 147: ......
Страница 193: ...Chapter 10 OPC UA Server 180 PACSystems RX7i RX3i TCP IP Ethernet Communications User Manual GFK 2224Q Example ...
Страница 202: ...Chapter 10 OPC UA Server GFK 2224Q January 2017 189 Figure 73 Machine Edition Online Command to Set Passwords ...
Страница 211: ......
Страница 253: ...Chapter 12 Diagnostics 240 PACSystems RX7i RX3i TCP IP Ethernet Communications User Manual GFK 2224Q ...
Страница 262: ...Chapter 13 Network Administration GFK 2224Q January 2017 249 ...
Страница 263: ......