Rectifier neutral input to X1-N-rectifer terminal,
•
Rectifier ground to X1-PE-rectifier terminal.
g. Connect the Fluoro UPS output cable from PDB power block 2 as follows (
•
Output load 1 to X1- L1 terminal,
•
Output load 2 to X1-L2 terminal,
•
Output load 3 to X1-L3 terminal,
•
Ground to X1-PE-Load terminal.
2. Tie the power cables to the UPS and place the protection plates back on the UPS.
1.4 Finalization
No finalization steps.