Aisys
7-104
04/08 M1046983
If the
Leak < 250 ml
is set to
Yes
:
• Flow 1 l/min O2 until pressure increases to 20 cm H
2
0.
• If pressure does not increase to 20 cm H
2
0 within in 15 seconds, fail with
“Cannot pressurize circuit”. If it does reach 20 cm H
2
0, change flow to
100 ml/min.
• If a flow of 100 ml/min reaches 30 cm H
2
0 or greater, display “Circuit leak is
less than 100 ml/min” and continue to next step. If it does not, gradually
increase flow until pressure reaches 30 cm H
2
0.
• If a flow is found that reaches 30 cm H20 and that flow is less than
750 ml/ min continue to next step but indicate that, “Ventilator circuit leak is
## ml/ min”.
• If the circuit pressure does not increase to 30 cm H2O with 750 ml/min flow,
fail with “Ventilator circuit leak is greater than 750 ml/min”.
Step 3: “Mechanical Ventilation” - Tests the Mechanical Ventilation by delivering small
Pressure Controlled breaths and look for alarms:
• If alarm condition is detected it will be stated in final menu.
• Continue to next step.
Step 4: “Circuit Compliance” - Tests the circuit compliance by delivering small
(15 cm H
2
O) Pressure Controlled breaths, measures the circuit volume via the
expiratory flow sensor, and looks for alarms:
• If the measured volume is less than 15 ml (either due to small patient circuit
or flow sensor issues) a “Check Flow Sensor” alarm may be generated that
prohibit the calculation of circuit compliance, state that “Can not measure
circuit compliance”.
• If alarms did not occur then calculate compliance and state, “Circuit
Compliance YYY ml/ cm H20”
Step 5: “O
2
Flow” - Run the mixer tests on O
2
channel (Check gas supply and run a 3L
and 10L flow delivery test and leak test:
• If O2 pressure is low, fail with “Low O2 Supply pressure”.
• If mixer does not fail the 3L, 10L and the leak test, continue with the next step.
• If mixer fails the 3L, 10L or the leak test, fail with the mixer failure.
Step 6: “AIR Flow” – Run the mixer tests on AIR channel (Check gas supply and run a
3L and 10L flow delivery test and leak test:
• If O2 is drive gas and air supply is low, continue with next step and indicate,
“Could not test air”.
• If Air is the drive gas and air supply is low, continue with next step and
indicate, “Ventilator has not drive gas”.
• If mixer does not fail the 3L,10L and the leak test, continue with the next step.
• If mixer fails the 3L,10L or the leak test, fail with the mixer failure.
Содержание Datex-Ohmeda Aisys Carestation
Страница 1: ...Aisys Anesthesia Machine Technical Reference Manual ...
Страница 16: ...Notes xiv 04 08 M1046983 ...
Страница 32: ...Notes 1 16 04 08 M1046983 ...
Страница 35: ...2 Theory of Operation M1046983 04 08 2 3 A M AB 75 098 L H D AB 75 046 J G I F K P O E D B C H N ...
Страница 158: ...Notes 5 20 04 08 M1046983 ...
Страница 288: ...Notes 7 106 04 08 M1046983 ...
Страница 325: ...9 Repair Procedures M1046983 04 08 9 29 The rear inverter A B C ...
Страница 356: ...Notes 9 60 04 08 M1046983 ...
Страница 397: ...10 Illustrated Parts M1046983 04 08 10 41 1 3 4 2 17 15 16 5 6 13 non DES cassette DES cassette 7 8 11 12 10 5 14 18 9 ...
Страница 399: ...10 Illustrated Parts M1046983 04 08 10 43 14 1 2 3 6 5 4 5 8 7 15 16 15 12 17 10 9 11 13 or 18 ...
Страница 401: ...10 Illustrated Parts M1046983 04 08 10 45 14 1 2 3 6 5 4 5 8 7 15 16 18 17 10 9 11 12 13 or ...
Страница 403: ...10 Illustrated Parts M1046983 04 08 10 47 14 15 18 1 2 3 6 5 4 5 8 7 17 10 9 11 15 16 12 13 or 17a 17c 17d 17b 17e ...
Страница 452: ...Notes 10 96 04 08 M1046983 ...
Страница 466: ...11 14 04 08 M1046983 Notes ...
Страница 470: ...Aisys 12 4 04 08 M1046983 12 3 System Schematics 12 3 1 Power Schematic ...
Страница 478: ...Aisys 12 12 04 08 M1046983 12 6 3 Tools Transfer Logs ...
Страница 495: ...12 Service Application M1046983 04 08 12 29 12 10 2 Vaporizer Subsystem Perform Vaporizer Test ...
Страница 497: ......