Therefore, the alarm delay is specified as 10 seconds. The following setting values are programmed in the EnerVista UR
Setup software.
The pickup setting for the stage 2 current unbalance trip element is specified as the unbalance current during maximum
system conditions midway between the third and fourth capacitor element failure unbalance currents.
(EQ 9.26)
Therefore, the trip delay is chosen 50 ms.
9.4.7 BANK PHASE OVERVOLTAGE SETTINGS
To protect the capacitor bank from overvoltage resulting from abnormal system conditions, the capability of the bank to
withstand transient overvoltages must be evaluated according to the IEEE 1036-1992 standard or to manufacturer specifi-
cations. For example, consider the following manufacturer overvoltage data:
•
2 pu overvoltage toleration for 0.25 second.
•
1.5 pu overvoltage toleration for 15 seconds.
•
1.25 pu overvoltage toleration for 5 minutes.
When the relay settings are calculated, the number of prospective overvoltage transients stressing the capacitor insulation
during the bank lifetime must be taken into account. As such, it is preferable to set the relay conservatively.
Based on the manufacturer overvoltage data above, three overvoltage trip stages are applied using a factor of 0.9 for the
stage pickup overvoltage levels and half of the allowable time indicated above.
(EQ 9.27)
60P trip
I
unbal f4_max
(
)
I
unbal f3_max
(
)
+
2
------------------------------------------------------------------------
0.0904 pu 0.0660 pu
+
2
------------------------------------------------------------
0.078 pu
=
=
=
59B pickup (stage 1)
0.9 1.25
×
1.125 pu
=
=
59B pickup (stage 2)
0.9 1.5
×
1.35 pu
=
=
59B pickup (stage 3)
0.9 2
×
1.80 pu
=
=
Содержание C70
Страница 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Страница 30: ...1 20 C70 Capacitor Bank Protection and Control System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 394: ...5 270 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 452: ...8 18 C70 Capacitor Bank Protection and Control System GE Multilin 8 1 OVERVIEW 8 THEORY OF OPERATION 8 ...
Страница 474: ...9 22 C70 Capacitor Bank Protection and Control System GE Multilin 9 4 SETTING EXAMPLE 9 APPLICATION OF SETTINGS 9 ...
Страница 486: ...10 12 C70 Capacitor Bank Protection and Control System GE Multilin 10 6 DISPOSAL 10 MAINTENANCE 10 ...
Страница 630: ...B 110 C70 Capacitor Bank Protection and Control System GE Multilin B 4 MEMORY MAPPING APPENDIX B B ...
Страница 676: ...E 10 C70 Capacitor Bank Protection and Control System GE Multilin E 1 OVERVIEW APPENDIX E E ...
Страница 688: ...F 12 C70 Capacitor Bank Protection and Control System GE Multilin F 2 DNP POINT LISTS APPENDIX F F ...
Страница 698: ...H 8 C70 Capacitor Bank Protection and Control System GE Multilin H 3 WARRANTY APPENDIX H H ...