GE Multilin
C70 Capacitor Bank Protection and Control System
1-5
1 GETTING STARTED
1.3 ENERVISTA UR SETUP SOFTWARE
1
1.3ENERVISTA UR SETUP SOFTWARE
1.3.1 SYSTEM REQUIREMENTS
The relay front panel or the EnerVista UR Setup software can be used to communicate with the relay. The software inter-
face is the preferred method to edit settings and view actual values because the computer monitor can display more infor-
mation.
The minimum system requirements for the EnerVista UR Setup software are as follows:
•
Pentium 4 (Core Duo recommended)
•
Windows XP with Service Pack 2 (Service Pack 3 recommended), Windows 7, or Windows Server 2008 Release 2
64-bit
•
1 GB of RAM (2 GB recommended)
•
500 MB free hard drive space (1 GB recommended)
•
1024 x 768 display (1280 x 800 recommended)
•
Serial port
•
Ethernet port of the same type as one of the UR CPU ports or a LAN connection to the UR
•
Internet access or a DVD drive
The following qualified modems have been tested to be compatible with the C70 and the EnerVista UR Setup software:
•
US Robotics external 56K FaxModem 5686
•
US Robotics external Sportster 56K X2
•
PCTEL 2304WT V.92 MDC internal modem
1.3.2 INSTALLATION
After ensuring that the requirements for using EnerVista UR Setup software are met, install the software from the GE
EnerVista DVD. Or download the UR EnerVista software from
http://www.gegridsolutions.com/multilin
and install it.
To install the UR EnerVista software from the DVD:
1.
Insert the GE EnerVista DVD into the DVD drive of your computer.
2.
Click the
Install Now
button and follow the instructions.
3.
When installation is complete, start the EnerVista Launchpad application.
4.
Click the
IED Setup
section of the
Launch Pad
window.
Figure 1–3: ADDING A UR DEVICE IN LAUNCHPAD WINDOW
5.
In the EnerVista Launch Pad window, click the
Add Product
button and select the appropriate product as follows.
Select the
Web
option to ensure the most recent software release, or select
CD
if you do not have an Internet connec-
Содержание C70
Страница 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Страница 30: ...1 20 C70 Capacitor Bank Protection and Control System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 394: ...5 270 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 452: ...8 18 C70 Capacitor Bank Protection and Control System GE Multilin 8 1 OVERVIEW 8 THEORY OF OPERATION 8 ...
Страница 474: ...9 22 C70 Capacitor Bank Protection and Control System GE Multilin 9 4 SETTING EXAMPLE 9 APPLICATION OF SETTINGS 9 ...
Страница 486: ...10 12 C70 Capacitor Bank Protection and Control System GE Multilin 10 6 DISPOSAL 10 MAINTENANCE 10 ...
Страница 630: ...B 110 C70 Capacitor Bank Protection and Control System GE Multilin B 4 MEMORY MAPPING APPENDIX B B ...
Страница 676: ...E 10 C70 Capacitor Bank Protection and Control System GE Multilin E 1 OVERVIEW APPENDIX E E ...
Страница 688: ...F 12 C70 Capacitor Bank Protection and Control System GE Multilin F 2 DNP POINT LISTS APPENDIX F F ...
Страница 698: ...H 8 C70 Capacitor Bank Protection and Control System GE Multilin H 3 WARRANTY APPENDIX H H ...