1-6
C70 Capacitor Bank Protection and Control System
GE Multilin
1.3 ENERVISTA UR SETUP SOFTWARE
1 GETTING STARTED
1
tion, then click the
Add Now
button to list software items for the product. EnerVista Launchpad obtains the software
from the Internet or DVD and automatically starts the installation program.
Figure 1–4: IDENTIFYING THE UR DEVICE TYPE
6.
Select the complete path, including the new directory name, where the EnerVista UR Setup software is to be installed.
7.
Click the
Next
button to begin the installation. The files are installed in the directory indicated, and the installation pro-
gram automatically creates icons and adds an entry to the Windows start menu.
8.
Click
Finish
to complete the installation. The UR device is added to the list of installed intelligent electronic devices
(IEDs) in the EnerVista Launchpad window, as shown.
Figure 1–5: UR DEVICE ADDED TO LAUNCHPAD WINDOW
1.3.3 CONFIGURING THE C70 FOR SOFTWARE ACCESS
a) OVERVIEW
You connect remotely to the C70 through the rear RS485 or Ethernet port with a computer running the EnerVista UR Setup
software. The C70 can also be accessed locally with a computer through the front panel RS232 port or the rear Ethernet
port using the
Quick Connect
feature.
•
To configure the C70 for remote access via the rear RS485 port, see the
Configuring Serial Communications
section.
•
To configure the C70 for remote access via the rear Ethernet port, see the
Configuring Ethernet Communications
sec-
tion.
•
To configure the C70 for local access with a computer through either the front RS232 port or rear Ethernet port, see the
Using the Quick Connect Feature
section.
Содержание C70
Страница 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Страница 30: ...1 20 C70 Capacitor Bank Protection and Control System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 394: ...5 270 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 452: ...8 18 C70 Capacitor Bank Protection and Control System GE Multilin 8 1 OVERVIEW 8 THEORY OF OPERATION 8 ...
Страница 474: ...9 22 C70 Capacitor Bank Protection and Control System GE Multilin 9 4 SETTING EXAMPLE 9 APPLICATION OF SETTINGS 9 ...
Страница 486: ...10 12 C70 Capacitor Bank Protection and Control System GE Multilin 10 6 DISPOSAL 10 MAINTENANCE 10 ...
Страница 630: ...B 110 C70 Capacitor Bank Protection and Control System GE Multilin B 4 MEMORY MAPPING APPENDIX B B ...
Страница 676: ...E 10 C70 Capacitor Bank Protection and Control System GE Multilin E 1 OVERVIEW APPENDIX E E ...
Страница 688: ...F 12 C70 Capacitor Bank Protection and Control System GE Multilin F 2 DNP POINT LISTS APPENDIX F F ...
Страница 698: ...H 8 C70 Capacitor Bank Protection and Control System GE Multilin H 3 WARRANTY APPENDIX H H ...