© 2019 Baker Hughes, a GE company, LLC. All rights reserved.
Masoneilan SVI FF Instruction Manual
=
|
73
5. Check Out and Power Up
Overview
This section provides the checkout procedures required to determine if the SVI FF is in working
order and to power up the unit.
Check Out Procedures
SVI FF checkout consists of physical and operational checkout procedures.
Physical Inspection
The physical checkout procedures include:
“Inspect Actuator, Linkages, or Rotary Adapter” on page 74
“Verify Mounting and Linkage Adjustment” on page 74
“Check the Electronic Module Connections” on page 77
Valve Mounting
Air Supply
Perform all procedures in this section before putting the SVI FF
into operation.
NOTE
Содержание Baker Hughes Masoneilan SVI FF
Страница 12: ...This page intentionally left blank ...
Страница 72: ...This page intentionally left blank ...
Страница 82: ...This page intentionally left blank ...
Страница 94: ...This page intentionally left blank ...
Страница 108: ...This page intentionally left blank ...
Страница 198: ...This page intentionally left blank ...
Страница 206: ...This page intentionally left blank ...
Страница 224: ...This page intentionally left blank ...
Страница 228: ...This page intentionally left blank ...
Страница 230: ...This page intentionally left blank ...
Страница 250: ...This page intentionally left blank ...
Страница 262: ...This page intentionally left blank ...
Страница 263: ......