![GE Baker Hughes Masoneilan SVI FF Скачать руководство пользователя страница 60](http://html.mh-extra.com/html/ge/baker-hughes-masoneilan-svi-ff/baker-hughes-masoneilan-svi-ff_installation-and-operation-manual_133070060.webp)
© 2019 Baker Hughes, a GE company, LLC. All rights reserved.
60
|
BHGE
4. Mount take-off bracket to stem block at angle which keeps turnbuckle assembly parallel
to stem (Figure 29) using:
a. For top: two plain 5/16 flat washers, helical spring washer 5/16, two hex nuts 5/16-18
regular.
b. For bottom: hex nut regular 1/4-20 and hex screw 1/4-20 UNC x 22.2 [.88] LG.
Figure 29 Bracket Configuration Strokes .5 - 2.50” and 3-6”
5. Ensure the turnbuckle assembly is parallel to the stem and the magnets are in the valve
closed position (Figure 30) and connect to take-off bracket.
Figure 30 Magnet Position with Valve Closed
2.00" to 2.50" stroke
.50" to 1.50" stroke
Bracket configuration
Strokes .50" to 2.50"
3.00" to 6.00" stroke
Bracket configuration
Strokes 3.00" to 6.00"
Position of magnets with
valve closed
Содержание Baker Hughes Masoneilan SVI FF
Страница 12: ...This page intentionally left blank ...
Страница 72: ...This page intentionally left blank ...
Страница 82: ...This page intentionally left blank ...
Страница 94: ...This page intentionally left blank ...
Страница 108: ...This page intentionally left blank ...
Страница 198: ...This page intentionally left blank ...
Страница 206: ...This page intentionally left blank ...
Страница 224: ...This page intentionally left blank ...
Страница 228: ...This page intentionally left blank ...
Страница 230: ...This page intentionally left blank ...
Страница 250: ...This page intentionally left blank ...
Страница 262: ...This page intentionally left blank ...
Страница 263: ......