13-21-611 Page 90
7-2
ASSEMBLY OF COUPLING ONTO THE AIREND AND MOTOR
Figure 7-2
– INSTALLATION OF COUPLING CUSHIONS
1.
Slide coupling halves over shaft extensions. Lock compressor half down with set screw.
2.
Assemble the motor to the compressor.
3.
Working through the coupling guard opening, slide motor half into compressor half.
*
After engaging each hub on the matching recesses of the coupling element, check that the gap
between the hub flats (see dimension “E” on Figure 8-2) is within 1.10/1.19 in (28.0/30.1 mm).
A smaller gap will produce abnormal wear of the element by friction and excessive thermal
expansion
– the latter could cause compressor damage by axially displacing the input shaft. Make
sure that keys are in proper alignment with key-ways on hubs.
*
Apply a thread-locking compound to the hub setscrews (M8 size) and tighten to 7.4 lb-ft (10 N-m)
of torque. Reinstall coupling guard with provided fasteners.
Rotating machinery can cause personal injury or death. Do not operate unit with
either the coupling guard or the collar removed. All bolts and screws must be
properly tightened.
ALIGNMENT
- The coupling is permanently aligned by the flanges on the compressor and motor.
Содержание ELECTRA-SAVER G2
Страница 11: ...13 21 611 Page 10 1 3 Figure 1 4 COMPRESSOR MOTOR SIDE Figure 1 5 COOLER RESERVOIR SIDE 309EBD797 B Ref Drawing...
Страница 12: ...13 21 611 Page 11 1 4 Figure 1 6 AIR OIL FLOW DIAGRAM 307EBD797 B Ref Drawing...
Страница 41: ...4 10 THIS PAGE INTENTIONALLY LEFT BLANK 13 21 611 Page 40...
Страница 42: ...4 10 FIGURE 4 6 COMPRESSOR PACKAGE P ID 13 21 611 Page 41 300EBF797 02 Ref Drawing...
Страница 70: ...13 21 611 Page 69 5 4 Figure 5 3 FLOW DIAGRAM AIR OIL SYSTEM 300EBF797 02 Ref Drawing...
Страница 71: ...5 5 13 21 611 Page 70 Figure 5 4 OIL FLOW DIAGRAM REMOTE MOUNTED COOLER 318EBD797 00 Ref Drawing...
Страница 74: ...13 21 611 Page 73 5 8 THIS PAGE INTENTIONALLY LEFT BLANK...