Revision 4
23
April 2020
Figure 3: Service Connections
2.4.2 Mating of the Process and Analyzer System Flanges
The analyzer is shipped with a 316 SS blind flange plate and gasket mounted inside the oven
enclosure to prevent the process gas from flowing into the compartment before installation
of the sample probe assembly. Check to ensure that this blind flange is in place and secure.
Explosive, toxic and hot gases and molten sulfur may be released once the
stream jacketed ball valve is opened. All company and/or regulatory agency
safety procedures and rules should be adhered to. Breathing apparatus and
personal protective equipment (ie. gloves, coveralls and protective eye wear)
should be worn and a safety person(s) should be observing. Do not take
unnecessary risks even if you believe the tailgas line to be at negative pressure.
Before mounting the analyzer at the process (sample) connection, check to ensure that the
following conditions have been met.
1. The bolt holes in the steam jacketed nozzle flange are large enough to accommodate
the four (4) bolts on the analyzer system flange
2. The two (2) flanges are correctly aligned
3. A new gasket of proper size and material is available
4. The appropriately sized nuts are available to put onto the system flange bolts (
5/8”, 11
UNC).
The sample probe length is unique to each individual analyzer. The length of the
probe is determined at time of ordering based on process pipe diameter and other
relevant dimensions such that the probe provides a minimum of 25% (i.e at
minimum
one quarter of the pipe’s inner diameter) penetration into the process
pipe.
If
all the above
conditions are satisfied:
Содержание 943-TGX-CE
Страница 132: ...Revision 4 132 April 2020 Figure 81 Oven Cabinet Door Removed ...
Страница 133: ...Revision 4 133 April 2020 Figure 82 Control Cabinet Door Removed ...
Страница 134: ...Revision 4 134 April 2020 Figure 83 Power Steam Air Signals Connection Details ...
Страница 135: ...Revision 4 135 April 2020 Figure 84 AC Wiring Schematic ...
Страница 136: ...Revision 4 136 April 2020 Figure 85 DC Signals and Wiring Diagram ...
Страница 137: ...Revision 4 137 April 2020 Figure 86 Flow Diagram ...