![Furukawa Unic URW370C4U Series Скачать руководство пользователя страница 99](http://html1.mh-extra.com/html/furukawa-unic/urw370c4u-series/urw370c4u-series_operation-and-maintenance-manual_2349551099.webp)
11-21
HOW TO OPERATE CRANE
Slew C.C.W.
(to the left )
Slew C.W.
(to the right)
For slewing direction of boom, “slew to
the right” means slewing in the direction in
which the hands of a clock rotate (C.W.) and
“slew to the left” means slewing in the oppo-
site direction of clock hands (C.C.W.) when
viewed from the top.
Before starting the boom to slew, sound the warning horn to those who
are attending or in the working site.
CAUTION
Содержание URW370C4U Series
Страница 2: ......
Страница 9: ...MEMO...
Страница 19: ...4 1 4 DESCRIPTION OF CARRIER EQUIPMENT 17 19 8 10 6 14 7 9 5 2 1 4 3 14 18 17 11 12 16 20 13 URW505C4U...
Страница 22: ...MEMO...
Страница 50: ...MEMO...
Страница 54: ...MEMO...
Страница 78: ...MEMO...
Страница 150: ...MEMO...
Страница 186: ...MEMO...
Страница 204: ...MEMO...
Страница 246: ......
Страница 247: ......
Страница 248: ...HEAD OFFICE Nihonbashi nishikawa Bldg 5 3 Nihonbashi 1 chome Chuo ku Tokyo 103 0027 Japan...