![Furukawa Unic URW370C4U Series Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/furukawa-unic/urw370c4u-series/urw370c4u-series_operation-and-maintenance-manual_2349551021.webp)
4-3
DESCRIPTION OF CARRIER EQUIPMENT
13.
Fuel meter
This indicates a residual quantity of the fuel.
14.
Interlock for crane-crawl operation
This allows the crawling levers to lock while
the crane is being operated and allows the
crane not to be operated by the crane con-
trol levers when it is crawling. This can be
switched by pressing “18 pedal”.
15.
Button for selecting crawling speed
This allows the crane to crawl faster while it
is being depressed.
16.
Warning lamp
The lamp lights to indicate that something is
wrong with each section.
17.
Emergency stop (engine) button
Depression of the switch allows the engine
to stop and all the crane operation including
traveling stop functioning.
18.
Pedal
It is used to release crawling levers.
19.
Head light
20.
Indicator lamp for High altitude
solenoid
The lamp lights when the solenoid operates at
an altitude of 2622 ~ 5500 ft.(800~1676m)
It allows the engine to decrease quantity of
jet.
1
. Rubber crawler
Cored bar and steel fabric(cords) are integrally
molded in the rubber which is of the same
quality as automobile tire.
2
. Wheel sprocket
It transmits driving power to the rubber crawl-
er to allow the crane to crawl.
3
. Idle roller
This is a roller which gives a proper tension to
the rubber crawler.
4
. Truck roller
This supports the weight of crane and rolls on
the rubber crawler.
5
. Crawling motor
Hydraulic motor with reduction gears which
transmits driving power to the wheel sprocket
is built inside.
6
. Crawling lever
This is to change crawling speed and direc-
tion.
7
. Accelerator pedal
This is to control engine speed.
8
. Driver's seat
This is a seat on which operator sits to oper-
ate the crane.
9
. Fuel tank
This is filled with diesel oil.
10.
Hydraulic oil tank
This is filled with hydraulic oil which is com-
monly supplied both to the carrier and to the
crane.
11.
Starter switch
This is a switch to start and stop the engine.
12.
Hour meter
This indicates total engine running time.
Содержание URW370C4U Series
Страница 2: ......
Страница 9: ...MEMO...
Страница 19: ...4 1 4 DESCRIPTION OF CARRIER EQUIPMENT 17 19 8 10 6 14 7 9 5 2 1 4 3 14 18 17 11 12 16 20 13 URW505C4U...
Страница 22: ...MEMO...
Страница 50: ...MEMO...
Страница 54: ...MEMO...
Страница 78: ...MEMO...
Страница 150: ...MEMO...
Страница 186: ...MEMO...
Страница 204: ...MEMO...
Страница 246: ......
Страница 247: ......
Страница 248: ...HEAD OFFICE Nihonbashi nishikawa Bldg 5 3 Nihonbashi 1 chome Chuo ku Tokyo 103 0027 Japan...