![Furukawa Unic URW370C4U Series Скачать руководство пользователя страница 212](http://html1.mh-extra.com/html/furukawa-unic/urw370c4u-series/urw370c4u-series_operation-and-maintenance-manual_2349551212.webp)
17-8
MAJOR SPECIFICATIONS
Equipment and construction
Boom telescoping
Boom:6-section, Hexagonal box beam
Telescoped by direct pushing of double acting hydraulic cylinder
together with by wire rope
(With hydraulic automatic locking device)
(2nd section : sequential actuation, 3rd, 4th, 5th & 6th sections: simul-
taneous actuation)
Boom derricking
Direct pushing by hydraulic cylinder
(With hydraulic automatic locking device)
Hoisting
Hydraulic motor: Axial plunger type
Reduction gears: Spur-gear reduction
Brake: Automatic mechanical brake
Slewing
Hydraulic motor: Axial plunger type
Reduction gears: Worm-gear+Spur-gear reduction
(Supported by ball bearings)
Brake: Worm self-lock
Hydraulic pump
Variable delivery piston pump
Hooking capacity
6610 lbs.(3.0t) Number of slinging rope: 4
Safety devices
Safety valve for hydraulic circuit
Hydraulic automatic lock
Automatic stop for overwinding
Overwinding alarm
Slewing automatic lock
Automatic stop for leaving minimum wire rope
Alarm buzzer
Retaining mechanism to prevent wire rope from disengagement
Interlock for crane-crawl operation
Crane/outrigger interlocking device
Checker for outrigger rotary set pin insertion
Emergency stop button
Level
3 colored lamp
Weight
Approx. 8670 lbs.(3940kg)
Содержание URW370C4U Series
Страница 2: ......
Страница 9: ...MEMO...
Страница 19: ...4 1 4 DESCRIPTION OF CARRIER EQUIPMENT 17 19 8 10 6 14 7 9 5 2 1 4 3 14 18 17 11 12 16 20 13 URW505C4U...
Страница 22: ...MEMO...
Страница 50: ...MEMO...
Страница 54: ...MEMO...
Страница 78: ...MEMO...
Страница 150: ...MEMO...
Страница 186: ...MEMO...
Страница 204: ...MEMO...
Страница 246: ......
Страница 247: ......
Страница 248: ...HEAD OFFICE Nihonbashi nishikawa Bldg 5 3 Nihonbashi 1 chome Chuo ku Tokyo 103 0027 Japan...