8.1
Powering On and Off a Partition
This section describes how to power on and power off partitions.
-
-
8.1.2 Powering off a partition
You can power on or off a partition from a Partition Operator account with Administrator or Operator privileges
for the partition.
All screenshots are display examples, and the actually displayed contents vary depending on the system
configuration and other factors.
8.1.1
Powering on a partition
The procedure for powering on the partition is as follows.
Operations
1. Log in to the MMB Web-UI.
The [MMB Web-UI] window appears.
2. Click [Partition] - [Power Control].
The [Power Control] window appears. For details on the [Power Control] window, see 1.3.1 [Power Control]
window in the
PRIMEQUEST 1000 Series Tool Reference
(C122-E110EN).
FIGURE 8.1 [Power Control] window (example)
3. Select [Power On] in [Power Control] for the partition that you are going to power on. Then, click the [Apply]
button.
PRIMEQUEST 1000 Series Installation Manual
CHAPTER 8 Powering On and Off a Partition
224
C122-E107-09EN
Содержание PRIMEQUEST 1000 Series
Страница 1: ...C122 E107 09EN FUJITSU Server PRIMEQUEST 1000 Series Installation Manual ...
Страница 2: ......
Страница 32: ...PRIMEQUEST 1000 Series Installation Manual CHAPTER 1 Installation Overview 4 C122 E107 09EN ...
Страница 44: ...PRIMEQUEST 1000 Series Installation Manual CHAPTER 2 Preparing for Main Unit Installation 16 C122 E107 09EN ...
Страница 260: ...PRIMEQUEST 1000 Series Installation Manual APPENDIX A Lists of Settings Links 232 C122 E107 09EN ...
Страница 284: ...PRIMEQUEST 1000 Series Installation Manual APPENDIX B Manual PSA Installation and Uninstallation 256 C122 E107 09EN ...
Страница 340: ...PRIMEQUEST 1000 Series Installation Manual APPENDIX F Setting up the NTP Server Windows 312 C122 E107 09EN ...
Страница 344: ......