2.9
Connecting the Power Cables
This section describes how to connect the power cables.
The main unit and PCI_Box are shipped with (three-wire) power cables equipped with a grounded plug. You need
to connect the power cables to outlets with ground terminals.
Remarks
The main unit and PCI_Box are designed to operate with a power supply facility that supports grounded wiring.
Do not connect the main unit and PCI_Box to a power supply facility that does not provide grounded wiring. To
determine the type of power supply in your building, contact the building manager or a qualified electrical engineer.
Operations
1. Confirm with an on-site electrical engineer that the input power satisfies power requirements. For details on
the power requirements, see 1.3 Installation Specifications in the
PRIMEQUEST 1000 Series Hardware
Installation Manual
(C122-H004EN).
2. Confirm that the power cables are connected to the AC inlets of the main unit and PCI_Box. Also confirm
that the power cables are secured with the AC cord clamps for the AC inlets on the main unit.
3. Group all the cables that run outside the main unit and PCI_Box into power cables and signal cables, and
secure them firmly to the cable holders of the 19-inch rack with cable ties.
4. Confirm that the AC power breaker is off. Then, connect the power cables to AC power. For details on the
2.4.2 Facility power requirements and characteristics
.
PRIMEQUEST 1000 Series Installation Manual
CHAPTER 2 Preparing for Main Unit Installation
14
C122-E107-09EN
Содержание PRIMEQUEST 1000 Series
Страница 1: ...C122 E107 09EN FUJITSU Server PRIMEQUEST 1000 Series Installation Manual ...
Страница 2: ......
Страница 32: ...PRIMEQUEST 1000 Series Installation Manual CHAPTER 1 Installation Overview 4 C122 E107 09EN ...
Страница 44: ...PRIMEQUEST 1000 Series Installation Manual CHAPTER 2 Preparing for Main Unit Installation 16 C122 E107 09EN ...
Страница 260: ...PRIMEQUEST 1000 Series Installation Manual APPENDIX A Lists of Settings Links 232 C122 E107 09EN ...
Страница 284: ...PRIMEQUEST 1000 Series Installation Manual APPENDIX B Manual PSA Installation and Uninstallation 256 C122 E107 09EN ...
Страница 340: ...PRIMEQUEST 1000 Series Installation Manual APPENDIX F Setting up the NTP Server Windows 312 C122 E107 09EN ...
Страница 344: ......