3.2
Starting the System
This section describes power control for system startup.
Use the following power-on procedure only when the power to the main unit is off.
3.2.1
Powering on and off the main unit
This section describes how to power on and power off the main unit.
Power on
The system will power on when the power cable is connected to the AC inlet on the main unit and to the AC power
supply (or the optional power distribution box). Confirm that the power cable is connected. The system will power
.)
To power on the system again after disconnecting the power cable, connect the power cable to the AC inlet on the
main unit and to the AC power supply.
Notes
- After disconnecting the power cable from the AC inlet, wait at least 10 seconds before reconnecting the power
cable to power on the system again.
- The detection of an overcurrent trips the breaker of the AC power supply (or the optional power distribution
box) to cut off power. The overcurrent indicates that a malfunction such as a short circuit occurred in the
main unit. In such cases, do not power on the system again. Instead, contact your sales representative or a
field engineer.
Power off
The procedure for turning off the main power is as follows.
(Damage to data)
Confirm that the System Power LED of the DVDB is off before turning off the main
power (e.g., UPS, power distribution box). If you turn off the main power (e.g., UPS,
power distribution box) while the System Power LED of the DVDB is on, data may be
damaged.
Operations
1. Power off the main unit. Power it off from the MMB. For details, see
8.1.2 Powering off a partition
2. Confirm that the System Power LED of the DVDB is off.
Remarks
If the System Power LED of the DVDB is on, the system cannot be powered off. If the Alarm LED is on,
contact your sales representative or a field engineer.
3. Disconnect the power cable from the power distribution box.
PRIMEQUEST 1000 Series Installation Manual
CHAPTER 3 Work before Operating System Installation
19
C122-E107-09EN
Содержание PRIMEQUEST 1000 Series
Страница 1: ...C122 E107 09EN FUJITSU Server PRIMEQUEST 1000 Series Installation Manual ...
Страница 2: ......
Страница 32: ...PRIMEQUEST 1000 Series Installation Manual CHAPTER 1 Installation Overview 4 C122 E107 09EN ...
Страница 44: ...PRIMEQUEST 1000 Series Installation Manual CHAPTER 2 Preparing for Main Unit Installation 16 C122 E107 09EN ...
Страница 260: ...PRIMEQUEST 1000 Series Installation Manual APPENDIX A Lists of Settings Links 232 C122 E107 09EN ...
Страница 284: ...PRIMEQUEST 1000 Series Installation Manual APPENDIX B Manual PSA Installation and Uninstallation 256 C122 E107 09EN ...
Страница 340: ...PRIMEQUEST 1000 Series Installation Manual APPENDIX F Setting up the NTP Server Windows 312 C122 E107 09EN ...
Страница 344: ......