CHAPTER 2
Preparing for Main Unit
Installation
This chapter describes the preparation before main unit installation.
This preparation includes work up to power cable connection.
....................................................... 6
2.2 Before Installing the Main Unit
..................................... 7
2.3 Checking Environmental Conditions
............................ 8
2.4 Preparing the Power Supply Equipment
2.5 Checking the Installation Site
..................................... 10
2.6 Preparing to Install the Main Unit
............................... 11
2.7 Confirming the Supplied Parts
................................... 12
2.8 Mounting the Main Unit in a 19-inch Rack
................. 13
2.9 Connecting the Power Cables
.................................... 14
Содержание PRIMEQUEST 1000 Series
Страница 1: ...C122 E107 09EN FUJITSU Server PRIMEQUEST 1000 Series Installation Manual ...
Страница 2: ......
Страница 32: ...PRIMEQUEST 1000 Series Installation Manual CHAPTER 1 Installation Overview 4 C122 E107 09EN ...
Страница 44: ...PRIMEQUEST 1000 Series Installation Manual CHAPTER 2 Preparing for Main Unit Installation 16 C122 E107 09EN ...
Страница 260: ...PRIMEQUEST 1000 Series Installation Manual APPENDIX A Lists of Settings Links 232 C122 E107 09EN ...
Страница 284: ...PRIMEQUEST 1000 Series Installation Manual APPENDIX B Manual PSA Installation and Uninstallation 256 C122 E107 09EN ...
Страница 340: ...PRIMEQUEST 1000 Series Installation Manual APPENDIX F Setting up the NTP Server Windows 312 C122 E107 09EN ...
Страница 344: ......