
1
ENGLISH
Preface
Thank you for purchasing our LONWORKS Interface Card "
OPC-LNW
."
Installing this card on your inverter makes it possible from other LONWORKS devices in the network to issue
run and speed commands and monitor the inverter running status, using LONWORKS parameters. It also
enables modification and monitoring of the inverter configuration as well as writing to and reading from the
inverter's function codes.
This instruction manual does not contain inverter handling instructions.
Read through this instruction manual in
conjunction with the inverter Instruction Manual and be familiar with proper handling and operation of this
product. Improper handling might result in incorrect operation, a short life, or even a failure of this product.
Keep this manual in a safe place.
Related Publications
Listed below are the other materials related to the use of the LONWORKS interface card. Read them in
conjunction with this manual as necessary.
• RS-485 Communication User's Manual
• Inverter instruction Manual
The materials are subject to change without notice. Be sure to obtain the latest editions for use.
A figure, existence of a terminal, a function code, an alarm code, etc. which have been written in this manual
may change with object inverters.
How this manual is organized
This manual is made up of chapters 1 through 10.
Chapter 1 Features
Gives an overview of the main features of the LONWORKS interface card.
Chapter 2 Acceptance Inspection
Lists points to be checked upon delivery of the interface card and precautions for transportation and storage of
the card. Also this chapter presents the appearance of the card and provides information on how to obtain an
XIF file and LNS plug-in.
Chapter 3 Basic Functions
Provides instructions on how to use the service button and status indicator LEDs.
Chapter 4 Installation and Removal
Provides instructions and precautions for installing the interface card.
Chapter 5 Wiring
Provides wiring instructions around the Basic Connection Diagram and the terminal blocks on the interface card
and the cable specifications.
Chapter 6 Function Code Settings Required for LONWORKS Communication
Describes the inverter's function codes to be set for receiving run and frequency commands via LONWORKS
network. It also lists the related function codes.
Chapter 7 Object Details
Describes the objects supported by the interface card and their network variables (NV) and configuration
properties (CP).
Chapter 8 Inverter Reaction to LONWORKS Communications Errors
Describes on how the inverter operates if a LONWORKS communications error occurs.
Chapter 9 Troubleshooting
Provides troubleshooting instructions for certain problems, e.g., when the inverter does not operate as ordered
or when an alarm condition has been recognized.
Chapter 10 Specifications
Lists the general specifications and communications specifications.
Содержание LONWORKS OPC-LNW
Страница 3: ......
Страница 4: ......
Страница 9: ...5 4 10 LED P N DC 25V 4 1 1 2 2 2 CN1 4 2 4 1 4 1 CN1 4 1 4 2 3 5 4...
Страница 10: ...6 CN1 4 1 FRENIC HVAC A port 4 2 FRENIC HVAC A port 4 2 2 4 2...
Страница 13: ...9 5 3 LONWORKS LONWORKS FRENIC HVAC 7 5kW FRENIC HVAC 22kW 5 4...
Страница 41: ...ENGLISH English Version...
Страница 42: ......
Страница 81: ...MEMO...
Страница 82: ...MEMO...