![Freiberg Instruments lexsyg research Скачать руководство пользователя страница 66](http://html1.mh-extra.com/html/freiberg-instruments/lexsyg-research/lexsyg-research_manual-and-documentation_2331334066.webp)
Freiberg
Instruments
GmbH
ּ Am St. Niclas Schacht 13 ּ 09599 Freiberg – Germany
66 / 78
2.2.5 Installation of the radiation source module
Process steps
1. Opening of the
lexsyg
housing
2. Taking out of the radiation source module off the
shielding shipping/storage container
3. Installation of a radiation protection shield
(10 mm acrylic glass)
4. Removal of the transport safety plate from the
radiation source module
5. Visual inspection and functionality check of the
radiation source module
6. Assembling of the radiation source module and
lead shield into the
lexsyg
7. Assembling and adjusting of the optical
components
8. Test run
duration
10 min
Typical distance to source
30 cm (eyes, body)
5 cm (hands)
Dose per handling
7 µSv (eyes, body)
50 µSv (hands)
Number of annual activities
5
notes
Ensure shutter is closed. Upon removing the
transport safety plate of the radiation source module
beta radiation escapes from the radiation source
module.
Use mobile radiation shield (10 mm acrylic glass)
and wear radiation protection goggles. Use
appropriate tools.
Removing the radiation source module from
lexsyg
research occurs in reverse order and takes about
5 min (no adjustment of optical components
necessary)