![Freiberg Instruments lexsyg research Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/freiberg-instruments/lexsyg-research/lexsyg-research_manual-and-documentation_2331334011.webp)
Freiberg
Instruments
GmbH
ּ Am St. Niclas Schacht 13 ּ 09599 Freiberg – Germany
11 / 78
Commissioning occurs by:
1. Positioning the equipment on a horizontal area.
2. Connecting with the main supply
, as shown on the “lexsyg supply” document.
Depending on configuration and intended use: nitrogen (helium), air pressure,
vacuum, electrical power, LAN
3. Switching-on the master controller
4. Starting the connected personal computer
5. turn on the tool
Keep in mind to place the sample materials on the intended position.
Warning notice:
Defiance can lead to mechanical damages of samples and equipment!
1.2.4.
Control of the Operating Status
Keep an eye on the operating status! It’s displayed on the left upper corner of the monitor
and on the display.
1.2.5.
Decommissioning
Decommissioning occurs by:
1. Shutting down the computer
2. turn the tool off
3. Disconnecting from the main supply
1.2.6.
Storage
Only store the equipment in closed dust-free rooms.
Temperature should lie between 5 and 40 °C, relative humidity must not be higher than 80%.
Warning notice:
Disconnect from the power supply when store the equipment for a longer
period of time.