1.  GENERAL INFORMATION FOR INSTALLERS, MAINTENANCE TEChNICIANS AND USERS

1.1. General warnings

This INSTRUCTION MANUAL, which is an integral and indispensable part of the product, must be handed over to the user by 

the installer and must be kept in a safe place for future reference. The manual must accompany the boiler should it be sold or its 

possession transferred. Following to the boiler installation, the installer is to advise the user on the boiler operation and its safety 

devices. This Manual must be left with the completed Benchmark commissioning booklet with the boiler as Regulation 29 of the HSC 

Gas safety (installation and use) Regulations 1998.

  

This boiler is designed for connection to a domestic heating or hot water system.

 

 

Any other use is deemed as improper and as such dangerous. Under no circumstances will the manufacturer be held 

 

 

responsible for damage or injury to persons or animals caused by errors in the installation and/or use of the 

 

 

appliance, or through non-compliance with current local and national standards and/or the manufacturer’s 

   instructions. 

The boiler must be installed by qualified personnel, in compliance with applicable laws and standards and according to the 

manufacturer’s instructions given in this manual.

In the UK, the installation must be carried out by a Registered Installer. To check for authorised qualified engineers please contact Gas 

Safe 0800 408 5500 It must be carried out in accordance with the relevant requirements of the:

• 

Gas Safety Regulations;

• 

The appropriate Building Regulations either The Building Regulation, The Building Regulations (Scotland), Building Regulations  

 

(Northern Ireland);

• 

The Water Fittings Regulations or Water Bylaws in Scotland;

• 

The current I.E.E. Wiring Regulations.

Where no specific instructions are given, reference should be made to the relevant British Standards Code of Practice.

In IE, the installation must be carried out by a competent Person and installed in accordance with the current edition of I.E. 813 

“Domestic Gas Installations”, the current Building Regulations and reference should be made to the current ETCI rules for electrical 

installations.

The commissioning of the boiler and any subsequent works carried out on the appliance must be effected by an appropriately 

qualified technician or an approved Fondital Helpline Service Centre technician.

Damage and/or injury caused by incorrect installation or use, or non-observance of the manufacturer’s instructions shall relieve the 

manufacturer from any and all contractual and extra-contractual liability.

Before installing the boiler, check that the technical data corresponds to the requirements for its correct use in the system design.

Check that the boiler is intact and it has not been damaged during transport and handling: do not install equipment which is damaged 

and/or faulty. In case of doubt, do not attempt to use the product but refer to the supplier. Packing materials (cardboard box, wooden 

crate, nails, staples, plastic bags, polystyrene, etc.) must not be left within reach of children in that these items represent a potential 

hazard and must be disposed of in a responsible manner.

Do not obstruct the air intake or flue exhaust grills and terminals.

Only manufacturer approved and supplied accessories or optional kits (including electric ones) are to be installed with this product.

Properly dispose of the packaging as all the materials can be recycled. The packaging must therefore be sent to specific waste 

management sites.

In the event of failure and/or malfunction, shut down the system. Do not interfere with or attempt any repairs. Call for professionally 

qualified technical assistance only. Fondital Helpline UK 01329 828555.

Any warranty repairs to the appliance must be carried out exclusively by the manufacturer’s authorised service centre using original 

spare parts. Non-observance of the above requirements may affect the safety of the boilers and endanger people, animals and 

property.

The manufacturer, in order to guarantee efficient and correct functioning of the equipment, recommends the boiler to be serviced and 

repaired by a Gas Safe Registered authorised Service Centre which is best trained for the purpose.

Before carrying out any cleaning or maintenance operations, disconnect the appliance from the mains electricity supply by switching 

off at the main switch and/or any other isolating device.

 

 

Routine boiler maintenance is to be performed according to the schedule indicated in the relevant section of this  

 

 

 manual. Appropriate boiler maintenance ensures efficient operation, environment preservation, and safety for people,  

 

 

 animals and objects.

In the event of long periods of inactivity of the boiler, disconnect it from power mains and close the gas Isolation valve. Warning!

When power mains are disconnected, boiler electronic anti-freeze function will not be operative.

Should there be a risk of freezing, add anti-freeze: it is not advisable to empty the system as this may result in damage; use specific 

anti-freeze products suitable for multi-metal heating systems.

Содержание Antea 24kW Range

Страница 1: ...IST 03 C 469 01 Gas fired wall mounted condensing boiler Antea 24kW 28kW Range INSTALLATION USE MAINTENANCE MANUAL ANTEA CONDENSING GB MADE IN ITALY...

Страница 2: ...accordance with the manufacturer s instructions by competent persons and that it meets the requirements of the appropriate Building Regulations The Benchmark Checklist can be used to demonstrate compl...

Страница 3: ...turer recommends that Customers contact competent and qualified personnel only for maintenance and repair operations All repair and maintenance should be carried out by a Gas Safe registered company e...

Страница 4: ...e of the manufacturer s instructions shall relieve the manufacturer from any and all contractual and extra contractual liability Before installing the boiler check that the technical data corresponds...

Страница 5: ...RS WITH NOMINAL HEAT INPUT 70 kW Gas fired boilers also comply with the following directives GAS APPLIANCES DIRECTIVE 90 396 CEE for CE compliance LOW VOLTAGE DIRECTIVE 2006 95 CE BOILER EFFICIENCY DI...

Страница 6: ...tion and domestic hot water press the boiler mode button 3 fig 1 until displaying the WINTER symbol this will activate both DHW and heating the display will show the primary flow water temperature 5 I...

Страница 7: ...cuit 22 4 4 Site requirements 22 4 4 1 Choosing where to install the boiler 22 4 4 2 Positioning the boiler 23 4 4 3 Boiler room ventilation 24 4 4 4 Flue 24 4 5 Installation authorised personnel only...

Страница 8: ...s discharge split pipe system 31 fig 16 Dimensions for connection to split pipe system 31 fig 17 Central heating curves with external probe operation 33 fig 18 Boiler casing opening procedure 38 fig 1...

Страница 9: ...of the Benchmark Scheme which aims to improve the standards of installation and commissioning of domestic heating and hot water systems in the UK and to encourage regular servicing to optimise safety...

Страница 10: ...s present l Parameter indicator Figures to view and edit parameters and indicate the burner current power rate percentage m Parameter indicator It turns on when entering the parameter programming mode...

Страница 11: ...oiler in WINTER mode DHW temperature outlet DHW temperature displayed Boiler in WINTER mode CH function active The flow water temperature is displayed Boiler in CENTRAL HEATING ONLY mode CH function a...

Страница 12: ...mperature via buttons 6 fig 1 CH water temperature adjusting range depends on operation range set through parameter P10 standard range 20 C to 78 C reduced range 20 C to 45 C Operation range selection...

Страница 13: ...system Please be aware that the thermostat is disabled when the boiler is in OFF mode Therefore if you want to protect both the boiler and the system use button 3 in fig 1 to select the WINTER mode Wh...

Страница 14: ...2 5 2 Shutdown due to air intake flue gas discharge system malfunction If the air flue gas system malfunctions the boiler shuts down The code E03 flue gas thermostat activation is displayed flashing o...

Страница 15: ...rol optional If the remote control is connected but the boiler does not receive instructions from it the boiler attempts to re establish communication for 60 seconds after which the fault code E31 is...

Страница 16: ...enance It Is recommended that the boiler case is only cleaned with non abrasive standard household cleaning products 2 7 Notes for the user The user may only access boiler parts that can be reached wi...

Страница 17: ...rculation function 30 seconds Post circulation function for heating temperature 78 C 30 seconds Post ventilation function after working 10 seconds Post ventilation function for heating temperature 95...

Страница 18: ...0 67 82 63 152 5 126 52 245 400 S SV bottom view top view G Gas inlet 1 2 F CH flow 3 4 DHW DHW outlet 1 2 CWI Cold water inlet 1 2 R CH return 3 4 S Condensate drain SV 3 bar safety valve drain cock...

Страница 19: ...be verified after a three minute boiler operation time fig 5 DHW CWI R G F S KC 24 Function Max CH heat input kW CH heat output 80 60 C kW CH heat output 50 30 C kW DHW output kW Gas mains pres sure...

Страница 20: ...09 Flue gas mass capacity g s 12 43 1 33 Flue gas temp air temp C 61 33 Maximum heat output efficiency rating 60 80 C 96 7 Maximum heat output efficiency rating 30 50 C 105 1 Minimum heat output effic...

Страница 21: ...registered to an approved scheme i e Gas Safe Register In GB the following Codes of Practice apply BS 5440 Part 1 2000 Flues BS 5440 Part 2 2000 Air Supply BS 5446 Installation of hot water supplies f...

Страница 22: ...lace water lost from the system This can be by manual or automatic means as shown in figs 6 and 7 A double check valve assembly must be used as show in pic 7 Filling of the system must be carried out...

Страница 23: ...be positioned for boiler connection to the gas supply pipe water mains supply pipe DHW flow pipe CH flow and return pipes The upper area of the template displays where air intake and flue gas ducts a...

Страница 24: ...s etc 300 Ba Above an opening air brick opening window etc 300 Ca Horizontally to an opening air brick opening window etc 300 D Below gutters soil pipes or drain pipes 25 E Below eaves 25 F Below balc...

Страница 25: ...n multi metal systems to produce a protective film on internal metal surfaces The Manufacturer can not be held liable for injury to people or animals or damage to property resulting from failure to fo...

Страница 26: ...connected to the relevant 1 2 CWI and DHW couplings on the boiler fig 4 Hardness of water supplied to the boiler may increase the plate heat exchanger cleaning replacement frequency All DHW circuits c...

Страница 27: ...r local regulations in force BS 6798 2000 Part H1 of the Building Regulations give further guidance 3 The discharge pipe should be run in a proprietary drain pipe material e g PVC PVC U ABS PVC C or P...

Страница 28: ...pecific Fondital approved condensate acid resistant pipes and systems must be used suitable for condensing boilers Flue gas discharge pipes are to be installed tilted toward the boiler so that condens...

Страница 29: ...posed walls The boiler is to be equipped with a fan mounted before the combustion chamber heat exchanger Type C83 Boiler intended to be connected to combustion air terminal and to a single flue gas di...

Страница 30: ...gth is to be reduced by 1 meter For each additional 45 elbow maximum permissible length is to be reduced by 0 5 meter The 100 60 mm roof coaxial terminal reduces maximum permissible length by 1 5 mete...

Страница 31: ...5 elbow maximum permissible length is to be reduced by 0 5 meter The roof terminal reduces maximum permissible length by 5 5 meters The wall terminal reduces maximum permissible length by 5 meters KC...

Страница 32: ...ssory supplied by manufacturer The remote control must only be installed by qualified personnel Only use original remote control units supplied by the manufacturer If non original remote controls are...

Страница 33: ...meter TSP10 setting and the thermoregulation curve coefficient is the following coefficient TSP10 value 84 67 The calculated room temperature is set using buttons 6 fig 1 that with external temperatur...

Страница 34: ...10 Heating output curves 0 to 3 f s P11 CH thermostat timer 0 to 10 min 4 minutes P12 CH power increase ramp timer 0 to 10 min 1 minute P13 Timer for CH post circulation freeze protection and flue cle...

Страница 35: ...play of DHW plate heat exchanger temperature P43 Display of boiler return temperature P44 Display of boiler temperature P45 Display of flue gas temperature temp probe P50 Display of boiler type X Y Z...

Страница 36: ...circulation pump shaft clockwise once the unblocking operation is completed screw the protective cap back on and check for water leaks When the protection cap is removed some water may flow out Befor...

Страница 37: ...y turning the ratio adjuster B fig 19 and ensure that reading falls within the limits of table 12 Let boiler flue cleaning function on and continue with the next point Minimum heat output adjustment F...

Страница 38: ...VERSIONE Stampo Attrezzatura Finitura superficia ISO 2768 mK Scala A termini di legge ci riserviamo la propriet del presente disegno con divieto di riproduzione totale o parziale senza la nostra autor...

Страница 39: ...39 A fig 21...

Страница 40: ...r must be of the type for which the boiler is designed If necessary convert the boiler following the instructions in subsection 4 14 Conversion to other gases types and burner adjustment This operatio...

Страница 41: ...meters by flue gas analysis check the condition and seal integrity of the flue gas discharge pipes check the state of combustion fan check integrity of safety devices of the boiler in general check fo...

Страница 42: ...tput To exit the flue cleaning mode press Reset or wait 15 minutes 6 3 2 Measurement procedure The boiler is equipped with a tower allowing for air intake flue gas discharge duct connection fig 22 and...

Страница 43: ...E bu bu bk bk pk pk wh bn bn wh gn bk gn gy bn bn gy bk bn bk ye bu rd wh wh rd rd or or pk pk ye ye 1 7 1 4 1 5 SS SRT SM1 SM2 SF 50Hz N L 230Vac X2 bu bn ygn rd wh bk 1516 17 N V X 3 3 1 1 3 4 P N X...

Страница 44: ...ressure switch FL TM flow switch timer SS DHW NTC probe 10K Ohm at 25 C B 3435 STR return NTC probe 10K Ohm at 25 C B 3435 SR1 SR2 CH NTC probe 10K Ohm at 25 C B 3435 SF flue gas NTC probe 10K Ohm at...

Страница 45: ...0 100 200 300 400 500 600 0 200 400 600 800 1000 1200 1400 Flow rate l h MODEL KC 24 KEY V1 Pump speed I min V2 Pump speed II V3 Pump speed III max KEY V1 Pump speed I min V2 Pump speed II V3 Pump sp...

Страница 46: ...anel and remove the burner panel fan assembly 7 3 Boiler cleaning Remove any deposits from heat exchanger using a suitable soft brush Never use brushes with metallic bristles Check all combustion cham...

Страница 47: ...losed Always ensure that the boiler is cool After replacing any gas carrying components or opening any gas connections always check for gas tightness After servicing check the operation of the boiler...

Страница 48: ...verse order and check for gas tightness Operate the boiler and adjust the gas valve as described in 3 7 Complete reassembly 8 6 Fuse fig 29 The fuse is located on the electronic board Note before acce...

Страница 49: ...ntainer and opening it Access the room sealed chamber and remove the burner panel fan assembly as described in 7 2 Disconnect the condensate drain pipe Disconnect the heat exchanger flue sensor as des...

Страница 50: ...way valve motor as described in 8 8 Unscrew the two screws holding the cartridge and remove it taking care non to drip water onto any electrical component Insert the new cartridge in place and reassem...

Страница 51: ...51 1 2 31 32 33 34 fig 31 9 Spare part list...

Страница 52: ...52 4 5 6 7 9 8 10 11 12 13 29 14 15 3 17 18 19 20 21 22 23 24 25 26 27 29 29 30 28 14 16 fig 32...

Страница 53: ...onversion kit for 24 kW 2 0TRASMET15 Natural gas conversion kit for 28 kW 2 0TRASGPL14 Propane conversion kit for 28 kW 2 15 6VALVGAS14 SIT 848_135 gas valve 1 16 6YBOBINA00 840 845 848 sit gas valve...

Страница 54: ...e faulty Replace the electrode Electronic board does not detect flame it is faulty Replace PCB Ignition heat output setting is too low Increase it Minimum heat output is not set correctly Check burner...

Страница 55: ...flow switch is not working System insufficient pressure or flow rate Check DHW system Check DHW flow switch filter DHW flow switch probe is faulty or disconnected Replace or reconnect it DHW flow swi...

Страница 56: ...56...

Страница 57: ...57...

Страница 58: ...58 Affix your analyser print out here...

Страница 59: ...59...

Страница 60: ...ondital it www fondital it Fondital Helpline UK unit 1 Spurlings Industrial estate Fareham Hants P017 6AB e mail admin fondital co uk The manufacturer reserves the right to implement any necessary and...

Отзывы: