4.12.  

filling the system

Once all boiler connections have been completed, CH system can be filled. 
The procedure is to be cautiously carried out, following each step:
- open the air purging valves on all radiators and verify the boiler automatic valve operation;
- Gradually open the relevant filling loop connection, checking any automatic bleeding valves installed in the system properly work;
- close all radiator air purging valves as soon as water starts coming out;
- check boiler water pressure gauge not to exceed 1÷1.3 bars reading;
- shut the filling loop and bleed any air out again, by opening the air bleeding valves on radiators;
- start the boiler and bring the system to working temperature, stop the boiler and wait for the pump to stop, then repeat the air bleeding 
procedures;
- allow the system to cool and restore water pressure to 1÷1.3 bars. 

WARNING

As regards treating water in domestic heating systems, it is advisable to use propriety branded products that are suitable for 

multi-metal plants, in order to optimize performance and safety, preserve these conditions over time, ensure regular operation of 

auxiliary equipment as well, and minimize energy consumption, in compliance with the applicable laws and standards.

WARNING

The safety low water flow switch protecting the heating system will not electrically enable the burner ignition when water flow rate is 

too low.

The low water safety pressure switch will not electrically enable the burner ignition when water pressure is below 0.4÷0.6 bar.

CH water pressure is not to be less than 1 bar. Restore proper value as needed, via the external filling loop of the boiler. 

The procedure is to be followed while the system is cold. The pressure gauge fitted on the boiler control panel indicates the pressure in 

the CH system. 

WARNING

After long inactivity of the boiler, its pump may be stuck. Before starting up the boiler, make sure that the pump is operating, by the 

following procedure:

- unscrew the protective cap at the centre of the pump motor;

- put a screwdriver into the hole and manually rotate the circulation pump shaft clockwise;

- once the unblocking operation is completed, screw the protective cap back on and check for water leaks.

When the protection cap is removed, some water may flow out. Before refitting the boiler casing ensure that all surfaces are properly 

dried.

4.13.  

Starting up the boiler

During first ignition of the boiler pour a glass of water in the flue gas tower so that the condensate trap is filled with water. 

This is a guarantee for the boiler’s tightness.

4.13.1.  

Preliminary checks

Before starting the boiler, check that:
- the flue gas discharge duct and the relative terminal are installed in conformity with the instructions: with the boiler operating there must 

be no leakage of combustion by-products from any of the gaskets;
- the supply power to the boiler must be 230 V – 50 Hz.
- the system is correctly filled with water (pressure gauge reading 1 to 1.3 bar);
- any shut-off cocks in the system pipes are open;
- the gas supplied to the boiler must be of the type for which the boiler is designed. If necessary, convert the boiler following the instructions in 
subsection 4.14. 

Conversion to other gases types and burner adjustment

. This operation must be carried out by a qualified service engineer;

- the gas supply cock is open;
the gas tightness test shows there are no gas leaks;
- the main switch installed adjacent to the boiler is turned on;
- the 3-bar safety valve is not stuck;
- there are no water leaks;
- the pump has not seized.
- the condensate trap installed on the boiler is discharging condensate correctly and is not stuck. 

WARNING

The boiler is equipped with a three-speed pump; three different residual head values correspond to each speed, according to the 

curves shown in figures 24 and 25.

It is delivered with the circulation pump set at the third speed setting.

If you wish to set a different speed, taking into account the water circulation requirements in the boiler (confirmed by the main water 

flow switch) and the resistance properties of the system, check operation of the boiler in all the conditions dictated by the features of 

the system (e.g. closure of one or more heating zones or of thermostat-controlled valves).

4.13.2.  

Switching on and switching off

To switch the boiler on and off, refer to the 

Instructions for the User.

Содержание Antea 24kW Range

Страница 1: ...IST 03 C 469 01 Gas fired wall mounted condensing boiler Antea 24kW 28kW Range INSTALLATION USE MAINTENANCE MANUAL ANTEA CONDENSING GB MADE IN ITALY...

Страница 2: ...accordance with the manufacturer s instructions by competent persons and that it meets the requirements of the appropriate Building Regulations The Benchmark Checklist can be used to demonstrate compl...

Страница 3: ...turer recommends that Customers contact competent and qualified personnel only for maintenance and repair operations All repair and maintenance should be carried out by a Gas Safe registered company e...

Страница 4: ...e of the manufacturer s instructions shall relieve the manufacturer from any and all contractual and extra contractual liability Before installing the boiler check that the technical data corresponds...

Страница 5: ...RS WITH NOMINAL HEAT INPUT 70 kW Gas fired boilers also comply with the following directives GAS APPLIANCES DIRECTIVE 90 396 CEE for CE compliance LOW VOLTAGE DIRECTIVE 2006 95 CE BOILER EFFICIENCY DI...

Страница 6: ...tion and domestic hot water press the boiler mode button 3 fig 1 until displaying the WINTER symbol this will activate both DHW and heating the display will show the primary flow water temperature 5 I...

Страница 7: ...cuit 22 4 4 Site requirements 22 4 4 1 Choosing where to install the boiler 22 4 4 2 Positioning the boiler 23 4 4 3 Boiler room ventilation 24 4 4 4 Flue 24 4 5 Installation authorised personnel only...

Страница 8: ...s discharge split pipe system 31 fig 16 Dimensions for connection to split pipe system 31 fig 17 Central heating curves with external probe operation 33 fig 18 Boiler casing opening procedure 38 fig 1...

Страница 9: ...of the Benchmark Scheme which aims to improve the standards of installation and commissioning of domestic heating and hot water systems in the UK and to encourage regular servicing to optimise safety...

Страница 10: ...s present l Parameter indicator Figures to view and edit parameters and indicate the burner current power rate percentage m Parameter indicator It turns on when entering the parameter programming mode...

Страница 11: ...oiler in WINTER mode DHW temperature outlet DHW temperature displayed Boiler in WINTER mode CH function active The flow water temperature is displayed Boiler in CENTRAL HEATING ONLY mode CH function a...

Страница 12: ...mperature via buttons 6 fig 1 CH water temperature adjusting range depends on operation range set through parameter P10 standard range 20 C to 78 C reduced range 20 C to 45 C Operation range selection...

Страница 13: ...system Please be aware that the thermostat is disabled when the boiler is in OFF mode Therefore if you want to protect both the boiler and the system use button 3 in fig 1 to select the WINTER mode Wh...

Страница 14: ...2 5 2 Shutdown due to air intake flue gas discharge system malfunction If the air flue gas system malfunctions the boiler shuts down The code E03 flue gas thermostat activation is displayed flashing o...

Страница 15: ...rol optional If the remote control is connected but the boiler does not receive instructions from it the boiler attempts to re establish communication for 60 seconds after which the fault code E31 is...

Страница 16: ...enance It Is recommended that the boiler case is only cleaned with non abrasive standard household cleaning products 2 7 Notes for the user The user may only access boiler parts that can be reached wi...

Страница 17: ...rculation function 30 seconds Post circulation function for heating temperature 78 C 30 seconds Post ventilation function after working 10 seconds Post ventilation function for heating temperature 95...

Страница 18: ...0 67 82 63 152 5 126 52 245 400 S SV bottom view top view G Gas inlet 1 2 F CH flow 3 4 DHW DHW outlet 1 2 CWI Cold water inlet 1 2 R CH return 3 4 S Condensate drain SV 3 bar safety valve drain cock...

Страница 19: ...be verified after a three minute boiler operation time fig 5 DHW CWI R G F S KC 24 Function Max CH heat input kW CH heat output 80 60 C kW CH heat output 50 30 C kW DHW output kW Gas mains pres sure...

Страница 20: ...09 Flue gas mass capacity g s 12 43 1 33 Flue gas temp air temp C 61 33 Maximum heat output efficiency rating 60 80 C 96 7 Maximum heat output efficiency rating 30 50 C 105 1 Minimum heat output effic...

Страница 21: ...registered to an approved scheme i e Gas Safe Register In GB the following Codes of Practice apply BS 5440 Part 1 2000 Flues BS 5440 Part 2 2000 Air Supply BS 5446 Installation of hot water supplies f...

Страница 22: ...lace water lost from the system This can be by manual or automatic means as shown in figs 6 and 7 A double check valve assembly must be used as show in pic 7 Filling of the system must be carried out...

Страница 23: ...be positioned for boiler connection to the gas supply pipe water mains supply pipe DHW flow pipe CH flow and return pipes The upper area of the template displays where air intake and flue gas ducts a...

Страница 24: ...s etc 300 Ba Above an opening air brick opening window etc 300 Ca Horizontally to an opening air brick opening window etc 300 D Below gutters soil pipes or drain pipes 25 E Below eaves 25 F Below balc...

Страница 25: ...n multi metal systems to produce a protective film on internal metal surfaces The Manufacturer can not be held liable for injury to people or animals or damage to property resulting from failure to fo...

Страница 26: ...connected to the relevant 1 2 CWI and DHW couplings on the boiler fig 4 Hardness of water supplied to the boiler may increase the plate heat exchanger cleaning replacement frequency All DHW circuits c...

Страница 27: ...r local regulations in force BS 6798 2000 Part H1 of the Building Regulations give further guidance 3 The discharge pipe should be run in a proprietary drain pipe material e g PVC PVC U ABS PVC C or P...

Страница 28: ...pecific Fondital approved condensate acid resistant pipes and systems must be used suitable for condensing boilers Flue gas discharge pipes are to be installed tilted toward the boiler so that condens...

Страница 29: ...posed walls The boiler is to be equipped with a fan mounted before the combustion chamber heat exchanger Type C83 Boiler intended to be connected to combustion air terminal and to a single flue gas di...

Страница 30: ...gth is to be reduced by 1 meter For each additional 45 elbow maximum permissible length is to be reduced by 0 5 meter The 100 60 mm roof coaxial terminal reduces maximum permissible length by 1 5 mete...

Страница 31: ...5 elbow maximum permissible length is to be reduced by 0 5 meter The roof terminal reduces maximum permissible length by 5 5 meters The wall terminal reduces maximum permissible length by 5 meters KC...

Страница 32: ...ssory supplied by manufacturer The remote control must only be installed by qualified personnel Only use original remote control units supplied by the manufacturer If non original remote controls are...

Страница 33: ...meter TSP10 setting and the thermoregulation curve coefficient is the following coefficient TSP10 value 84 67 The calculated room temperature is set using buttons 6 fig 1 that with external temperatur...

Страница 34: ...10 Heating output curves 0 to 3 f s P11 CH thermostat timer 0 to 10 min 4 minutes P12 CH power increase ramp timer 0 to 10 min 1 minute P13 Timer for CH post circulation freeze protection and flue cle...

Страница 35: ...play of DHW plate heat exchanger temperature P43 Display of boiler return temperature P44 Display of boiler temperature P45 Display of flue gas temperature temp probe P50 Display of boiler type X Y Z...

Страница 36: ...circulation pump shaft clockwise once the unblocking operation is completed screw the protective cap back on and check for water leaks When the protection cap is removed some water may flow out Befor...

Страница 37: ...y turning the ratio adjuster B fig 19 and ensure that reading falls within the limits of table 12 Let boiler flue cleaning function on and continue with the next point Minimum heat output adjustment F...

Страница 38: ...VERSIONE Stampo Attrezzatura Finitura superficia ISO 2768 mK Scala A termini di legge ci riserviamo la propriet del presente disegno con divieto di riproduzione totale o parziale senza la nostra autor...

Страница 39: ...39 A fig 21...

Страница 40: ...r must be of the type for which the boiler is designed If necessary convert the boiler following the instructions in subsection 4 14 Conversion to other gases types and burner adjustment This operatio...

Страница 41: ...meters by flue gas analysis check the condition and seal integrity of the flue gas discharge pipes check the state of combustion fan check integrity of safety devices of the boiler in general check fo...

Страница 42: ...tput To exit the flue cleaning mode press Reset or wait 15 minutes 6 3 2 Measurement procedure The boiler is equipped with a tower allowing for air intake flue gas discharge duct connection fig 22 and...

Страница 43: ...E bu bu bk bk pk pk wh bn bn wh gn bk gn gy bn bn gy bk bn bk ye bu rd wh wh rd rd or or pk pk ye ye 1 7 1 4 1 5 SS SRT SM1 SM2 SF 50Hz N L 230Vac X2 bu bn ygn rd wh bk 1516 17 N V X 3 3 1 1 3 4 P N X...

Страница 44: ...ressure switch FL TM flow switch timer SS DHW NTC probe 10K Ohm at 25 C B 3435 STR return NTC probe 10K Ohm at 25 C B 3435 SR1 SR2 CH NTC probe 10K Ohm at 25 C B 3435 SF flue gas NTC probe 10K Ohm at...

Страница 45: ...0 100 200 300 400 500 600 0 200 400 600 800 1000 1200 1400 Flow rate l h MODEL KC 24 KEY V1 Pump speed I min V2 Pump speed II V3 Pump speed III max KEY V1 Pump speed I min V2 Pump speed II V3 Pump sp...

Страница 46: ...anel and remove the burner panel fan assembly 7 3 Boiler cleaning Remove any deposits from heat exchanger using a suitable soft brush Never use brushes with metallic bristles Check all combustion cham...

Страница 47: ...losed Always ensure that the boiler is cool After replacing any gas carrying components or opening any gas connections always check for gas tightness After servicing check the operation of the boiler...

Страница 48: ...verse order and check for gas tightness Operate the boiler and adjust the gas valve as described in 3 7 Complete reassembly 8 6 Fuse fig 29 The fuse is located on the electronic board Note before acce...

Страница 49: ...ntainer and opening it Access the room sealed chamber and remove the burner panel fan assembly as described in 7 2 Disconnect the condensate drain pipe Disconnect the heat exchanger flue sensor as des...

Страница 50: ...way valve motor as described in 8 8 Unscrew the two screws holding the cartridge and remove it taking care non to drip water onto any electrical component Insert the new cartridge in place and reassem...

Страница 51: ...51 1 2 31 32 33 34 fig 31 9 Spare part list...

Страница 52: ...52 4 5 6 7 9 8 10 11 12 13 29 14 15 3 17 18 19 20 21 22 23 24 25 26 27 29 29 30 28 14 16 fig 32...

Страница 53: ...onversion kit for 24 kW 2 0TRASMET15 Natural gas conversion kit for 28 kW 2 0TRASGPL14 Propane conversion kit for 28 kW 2 15 6VALVGAS14 SIT 848_135 gas valve 1 16 6YBOBINA00 840 845 848 sit gas valve...

Страница 54: ...e faulty Replace the electrode Electronic board does not detect flame it is faulty Replace PCB Ignition heat output setting is too low Increase it Minimum heat output is not set correctly Check burner...

Страница 55: ...flow switch is not working System insufficient pressure or flow rate Check DHW system Check DHW flow switch filter DHW flow switch probe is faulty or disconnected Replace or reconnect it DHW flow swi...

Страница 56: ...56...

Страница 57: ...57...

Страница 58: ...58 Affix your analyser print out here...

Страница 59: ...59...

Страница 60: ...ondital it www fondital it Fondital Helpline UK unit 1 Spurlings Industrial estate Fareham Hants P017 6AB e mail admin fondital co uk The manufacturer reserves the right to implement any necessary and...

Отзывы: