27
Boiler
50 mm per met
re of pipe run
2,5° Minimum
fall
Termination to a
purpose made soak-away
Holes in the soak-away
must face away from the
building
500 mm min
Boiler
External termination via
internal discharge branch
e.g. sink waste - downstream
Pipe must terminate
above water level but
below surrounding
surface
50 mm per metre
of pipe run
2,5° Minimum
fall
Tun
dish
Boiler
Pipe must terminate above
water level but below
surrounding surface
Termination to a drain or gully
50 mm per m
etre of pipe run
2,5° Minimum
fall
Boiler
50 mm per met
re of pipe run
2,5° Minimum
fall
Termination to a
purpose made soak-away
Holes in the soak-away
must face away from the
building
500 mm min
fAILURE TO INSTALL THE CONDENSATE DISCHARGE PIPEWORK CORRECTLY WILL AffECT THE RELIABLE
OPERATION Of THE BOILER
The condensate discharge pipe MUST NOT RISE at any point along its length. There MUST be a fall of AT LEAST 2.5° (50mm per metre) along the
entire run.
1. The condensate outlet will accept 21.5 mm (3/4 in) plastic overflow pipe which should generally discharge internally into the house
hold drainage system. If this is not possible, discharge into an outside drain is acceptable.
2. Ensure the discharge of condensate complies with any national or local regulations in force.
BS 6798:2000 & Part H1 of the Building Regulations give further guidance.
3. The discharge pipe should be run in a proprietary drain pipe material e.g. PVC, PVC-U, ABS, PVC-C or PP.
4. Metal pipework is NOT suitable for use in condensate discharge systems.
5. The pipe should be a minimum of 21.5 mm diameter and must be supported using suitably spaced clips to prevent sagging.
6. It is advisable to keep the condensate pipe internal.
7. External runs greater than 3 metres or runs in cold areas should use 32 mm waste pipe.
8. If the boiler is fitted in an unheated location the entire condensate discharge pipe should be treated as an external run.
9. In all cases discharge pipe must be installed to aid disposal of the condensate. To reduce the risk of condensate being trapped, as few bends
and fittings as possible should be used.
10. When discharging condensate into a soil stack or waste pipe the effects of existing plumbing must be considered. If soil
pipes or waste pipes are subjected to internal pressure fluctuations when WC’s are flushed or sinks emptied then back-pressure may force water
out of the boiler trap and cause appliance lockout.
Examples are shown of the following methods of termination:
i) to an internal soil & vent pipe
ii) via an internal discharge branch (e.g. sink waste)
iii) to a drain or gully
iv) to a purpose made soakaway
Содержание Antea 24kW Range
Страница 39: ...39 A fig 21...
Страница 51: ...51 1 2 31 32 33 34 fig 31 9 Spare part list...
Страница 52: ...52 4 5 6 7 9 8 10 11 12 13 29 14 15 3 17 18 19 20 21 22 23 24 25 26 27 29 29 30 28 14 16 fig 32...
Страница 56: ...56...
Страница 57: ...57...
Страница 58: ...58 Affix your analyser print out here...
Страница 59: ...59...