Preparing for Operation
Instrument Preparation
2
2-5
Unpacking and Inspecting the Instrument
Verify the contents of the shipping package against the shipping label located on
the outside of the shipping package. If any items are missing or damaged, report
the problem immediately to your Fluke representative.
Carefully remove the instrument from its shipping container, saving the packaging
materials if possible.
Positioning and Rack Mounting
Position the instrument in any location that meets the environmental specifications.
(Refer to Appendix A.) The Rack Mounting Kit for the 2680 Series, model Y2680,
(Part Number 1777577) includes hardware and instructions for mounting the
instrument.
Connecting to a Power Source and Grounding
You can connect the instrument to an ac power source between 100 – 240 V ac
(50/60 Hz), to a dc power source between 9 and 45 V dc, or to both. Fluke
guarantees equipment specifications only for 50 Hz and 60 Hz mains operation
and dc operation. Refer to Figure 2-2 and the descriptions below for making power
connections. If you connect both ac power and dc power to the instrument, the
instrument uses ac power when it exceeds approximately 8 times the value of the
dc voltage. Automatic switchover occurs between ac and dc power without
interrupting instrument operation.
If you connect both ac and dc power to the instrument, the ac and dc ground
connections must be to the same earth ground terminal.
Содержание 2680A
Страница 8: ......
Страница 14: ...2680A 2686A Users Manual vi ...
Страница 20: ...2680A 2686A Users Manual 1 2 ...
Страница 98: ...2680A 2686A Users Manual 2 62 ...
Страница 196: ......
Страница 228: ...2680A 2686A Users Manual A 32 ...
Страница 236: ...2680A 2686A Users Manual C 4 ...
Страница 242: ...2680A 2686A Users Manual D 6 ...
Страница 274: ...2680A 2686A Users Manual 6 ...