Preparing for Operation
Instrument Preparation
2
2-11
100V- 240V
47Hz / 63Hz
100VA MAX
MAIN SUPPLY
NO INTERNAL USER SERVICEABLE PARTS.
REFER SERVICE TO QUALIFIED SERVICE PERSONNEL
WARNING:
TO AVOID
ELECTRIC SHOCK GROUNDING
CONNECTOR IN POWER CORD
MUST BE CONNECTED
100V- 240V
47Hz / 63Hz
100VA MAX
MAIN SUPPLY
NO INTERNAL USER SERVICEABLE PARTS.
REFER SERVICE TO QUALIFIED SERVICE PERSONNEL
WARNING:
TO AVOID
ELECTRIC SHOCK GROUNDING
CONNECTOR IN POWER CORD
MUST BE CONNECTED
100V- 240V
47Hz / 63Hz
100VA MAX
MAIN SUPPLY
NO INTERNAL USER SERVICEABLE PARTS.
REFER SERVICE TO QUALIFIED SERVICE PERSONNEL
WARNING:
TO AVOID
ELECTRIC SHOCK GROUNDING
CONNECTOR IN POWER CORD
MUST BE CONNECTED
Master Instrument
Other Grouped Instrument
Other Grouped Instrument
External
trigger
if used
alg54f.eps
Figure 2-4. External Trigger Wiring for a Group of Instruments
Содержание 2680A
Страница 8: ......
Страница 14: ...2680A 2686A Users Manual vi ...
Страница 20: ...2680A 2686A Users Manual 1 2 ...
Страница 98: ...2680A 2686A Users Manual 2 62 ...
Страница 196: ......
Страница 228: ...2680A 2686A Users Manual A 32 ...
Страница 236: ...2680A 2686A Users Manual C 4 ...
Страница 242: ...2680A 2686A Users Manual D 6 ...
Страница 274: ...2680A 2686A Users Manual 6 ...