Multifunction Electrical Tester Calibrator
Adjustment Procedures
39
Figure 28. High Resistance Meters 5 kV Adjustment Connections
10 G
Ω
Input Resistance Calibration
The internal voltmeter adjustment of the 5 kV high resistance source procedure requests a
measurement of one 10 G
Ω
resistor.
To adjust the Product:
1. Connect the Product to the 1653, see
2. From the Product calibration menu, highlight
HVR Meter Input Resistance
and push
E
.
3. Measure the value with a standard meter.
4. Write down the new value. Use the cursor keys and the numerical keypad to enter the new
value.
5. Confirm the value with the
Write
softkey. If there is no need to change the value, push the
Exit
softkey to keep the original value.
This completes this part of the adjustment.
High Resistance Source Meters 1.5 kV Adjustment
Adjustment of High Resistance Source Meters 1.5 kV consists of two steps:
1. Voltmeter adjustment HVR V01-HVR V04
2. Ammeter adjustment HVR I01
1
4
7
/
+
STBY
5522A CALIBRATOR
Fluke 5322A Fluke 5522A