IJ PUMP OPERATION AND MAINTENANCE MANUAL
3-9
BO2660-01
ALIGNMENT SCHEDULE
1. First, verify that turbine is correctly
aligned with plant benchmark and fixed
in its permanent position.
2. Next, set up common centerline by
aligning centerline of high-speed pump
soleplates with centerline of turbine
shaft.
3. Then align centerline of low-speed
pump baseplate with common
centerline.
4. Finally, align centerline of any other
baseplate (or soleplates) which might be
in train with common centerline.
Figure 3-8 Baseplates and Soleplates in Train
Содержание IJ
Страница 2: ...IJ PUMP INSTALLATION OPERATION MAINTENANCE ...
Страница 3: ......
Страница 5: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 iv ...
Страница 11: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 x ...
Страница 13: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 xii ...
Страница 17: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 xvi ...
Страница 25: ......
Страница 35: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 2 10 Figure 2 1 Foundation Bolt ...
Страница 65: ......
Страница 79: ......
Страница 83: ......