IJ PUMP OPERATION AND MAINTENANCE MANUAL
3-7
BO2660-01
Figure 3-6 Leveling Driver End Lengthwise
Figure 3-7 Leveling Pump End Lengthwise
3). Tighten foundation anchor bolts, and pump feet holddown bolts. As you tighten
bolts, position level as illustrated in the four leveling figures and check leveling in
both crosswise and lengthwise directions. If tightening bolts disturbs leveling, add or
remove shims or adjust leveling screws until baseplate is level in both directions at
places where leveling was disturbed. Again tighten bolts and verify leveling in both
directions. Continue this procedure until all bolts are tight and the baseplate is level;
both lengthwise and crosswise.
Содержание IJ
Страница 2: ...IJ PUMP INSTALLATION OPERATION MAINTENANCE ...
Страница 3: ......
Страница 5: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 iv ...
Страница 11: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 x ...
Страница 13: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 xii ...
Страница 17: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 xvi ...
Страница 25: ......
Страница 35: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 2 10 Figure 2 1 Foundation Bolt ...
Страница 65: ......
Страница 79: ......
Страница 83: ......