IJ PUMP OPERATION AND MAINTENANCE MANUAL
2-1
BO2660-01
2. RECEIVING, STORAGE, AND PREINSTALLATION
The information in this subsection about receiving, storage, and recommendations regarding space
and foundations apply to the barrel pump.
2.1 RECEIVING
Flowserve ships the pump mounted on its cradle and soleplates, which is secured to a skid formed of
heavy timbers, and when greater protection is necessary provides a shipping enclosure as well. If
Flowserve provides the driver and the auxiliary equipment, they are shipped separately, but prepared
and handled in the same manner as the pump. Shipments of pump and driver that terminate within the
Continental Limits of the United States are protected by an open-frame. For some shipments into
areas of extreme climatic condition a 6-mil (0.2 mm) clear, plastic cover over the unit provides
additional protection.
2.1.1 SHIPMENT INSPECTION
Directly on receiving the shipment, it is important to perform a visual inspection of the entire pump
unit (that is, motor, piping, vents, etc.,) as follows:
1. Check shipping enclosure for evidence of mishandling and clear plastic cover for tears, rips,
and misuse; also verify presence of vapor-phase inhibitor.
2. Remove enclosure and cover, and check shipment for damage from collision and the
elements.
3. Check auxiliary equipment and piping for distortion, breakage, gouges, and deep scratches.
4. Check pump, driver, and accessories for deep scratches and gouges; painted surfaces for
damage.
5. Check for missing or disturbed flange covers and piping plugs.
6. Check equipment against manifest, and list shortages.
If you discover damage or shortage, the details should be immediately reported to the transportation
company's local agent and to your nearest Flowserve office. For the address and telephone number,
see PARTS ORDERING AND SERVICING INFORMATION.
2.1.2 INBOARD AND OUTBOARD BEARING SHIPPING SHIMS
CAUTION
Do not rotate shaft with shipping shims installed. Failure to
comply can result in damage to the shaft.
When the bearing housings bear an identification that shipping shims are installed in place of tilting
pad journal bearings (the bearings are boxed separately) remove the shipping shims and install
bearings before rotating the shaft.
2.1.3 LIFTING
For weights of pump, driver, and cradle and soleplates, see the OUTLINE drawing in the back of this
manual.
Содержание IJ
Страница 2: ...IJ PUMP INSTALLATION OPERATION MAINTENANCE ...
Страница 3: ......
Страница 5: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 iv ...
Страница 11: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 x ...
Страница 13: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 xii ...
Страница 17: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 xvi ...
Страница 25: ......
Страница 35: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 2 10 Figure 2 1 Foundation Bolt ...
Страница 65: ......
Страница 79: ......
Страница 83: ......