Flexball Italiana S.r.l.
5
13.3.
Specific parameters...................................................................................................................... 76
14. Programming of actuators for installations with electronic engine and mechanical gearbox ................... 77
14.1.
Programming of the gearbox strokes ............................................................................................ 78
14.2.
Sea trials ...................................................................................................................................... 80
14.3.
Specific parameters...................................................................................................................... 82
14.3.1.
Parameters to configure the voltage output signal for electronic engines .............................. 82
14.3.2.
Parameters to configure the voltage output signals .............................................................. 83
15. Programming of actuators for mechanical engines and electronic gearbox ............................................ 84
15.1.
Installation of engine the push-pull cable and programming of throttle mechanical strokes ............ 84
15.2.
Programming of the push-pull cable strokes ................................................................................. 84
15.3.
Electrical cabling of the gearbox ................................................................................................... 84
15.4.
Specific parameters...................................................................................................................... 84
16. Programming of actuators with electronic engine and electronic gearbox .............................................. 85
16.1.
Electrical wiring ............................................................................................................................ 85
16.2.
Specific parameters...................................................................................................................... 85
17. Programming of actuators with electronic CANBUS engine and mechanical gearbox ............................ 86
17.1.
Installation of the push-pull cable and programming of the cable stroke ........................................ 86
17.2.
Specific parameters...................................................................................................................... 86
17.2.1.
CANBus protocol ................................................................................................................. 86
17.2.2.
Setting of the CANBus parameter values ............................................................................. 87
17.2.3.
Technical data of the CANBus interface card ....................................................................... 88
17.3.
Wiring of the outgoing actuator cables .......................................................................................... 88
17.4.
Connection to FPT engines through CANBus interface ................................................................. 88
Micro switch B4, here shown with tag “4”, must be switched in OFF position in order to allow CANBus
communication between Flexball Electronic Command System and FPT engine. .......................................... 88
18. Programming of actuators with electronic CANBUS engine and electronic gearbox ............................... 90
18.1.
CANBus engine parameters ......................................................................................................... 90
18.2.
Electronic gearbox parameters ..................................................................................................... 90
18.3.
Wiring of the actuator outgoing cables .......................................................................................... 90
19. System configuration in case of options ................................................................................................ 90
19.1.
Commissioning of actuators for installations with Trim or Flap command option ............................ 90
19.2.
Commissioning of actuators for installations with Trolling option ................................................... 90
19.3.
Commissioning of the actuators with Neutral Relay option ............................................................ 91
19.4.
Programming of the actuators with Hybrid Engine option .............................................................. 92
21. Trouble shooting ................................................................................................................................... 93
21.1.
What to do in case of system failure ............................................................................................. 93
21.1.1.
Behavior of the system in case of unforeseen shutdown ....................................................... 93
21.1.2.
Emergency lever and how to overcome faults during navigation in case of system with
mechanical interface ............................................................................................................................. 93
21.1.3.
Self-protection in case of overload or breakage of the push-pull cables ................................ 94
21.2.
Analysis of the electronic system behavior.................................................................................... 95
21.3.
Diagnosis through the command station ....................................................................................... 97
23. Drilling mask for command station ........................................................................................................ 98
23.1.
Command station series 3500 ...................................................................................................... 98
23.2.
Command station series 4000 ...................................................................................................... 98
23.3.
Command station series 4200 ...................................................................................................... 99
23.4.
Command station series 4500 ...................................................................................................... 99
24. Drilling mask for actuator .................................................................................................................... 100