102
4
OPERATION AND USE
id.:
DB 260 REV. 00 01/07/2015
amount of material and reducing the arm raising time.
- Raise the arm to its maximum height while moving backward.
- Stop the vehicle.
- Open the unloading hatch and wait until the cement has poured into the drum through the hopper helping it
along by vigorously shaking the bucket with the arm.
- Approach the heap again while lowering the arm.
- Repeat the operations described above at least 8÷9 times. This is the bucket yield on average to obtain
optimal drum loading.
CAUTION: You can shift to reverse gear even if the vehicle has not completely stopped.
4.10.8. MIXING AND SECOND FILLING WITH WATER
(fi g. 37)
- Keep the drum rotating for about 2 minutes after the last aggregate loading phase.
- Add the remaining amount of water, about 30% of the total, following the procedures described in chapter
4.10.5 to obtain the desired fl uidity.
37
Содержание DB 260
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 22: ......
Страница 48: ...48 3 SAFETY PRECAUTIONS id DB 260 REV 00 01 07 2015 VEHICLE EXTERIOR ...
Страница 110: ......
Страница 166: ...166 TECHNICAL ANNEXES DB 260 REV 00 01 07 2015 id HYDRAULIC DIAGRAM ...
Страница 168: ......
Страница 174: ......
Страница 175: ...2013 04 08 00 02 0796 Catalog Section 78 PowerView Model PV101 C User s Guide Version3 2 ...
Страница 176: ......
Страница 183: ...00 02 0796 3 2013 04 08 Faceplate Features ...
Страница 221: ...00 02 0796 41 2013 04 08 NOTES ...
Страница 222: ...NOTES ...
Страница 223: ...NOTES ...
Страница 226: ...www fwmurphy com PV101 ...