101
4
OPERATION AND USE
id.:
DB 260 REV. 00 01/07/2015
4.10.7.a Heaped aggregate
(fi g. 36)
- Keep the drum rotating at top speed.
- Lower the arm after checking that the hatch has closed.
- On the mechanical gearbox, select the 1st working speed (low).
- Dig into the heap with the bucket and at the same time raise the arm, that way fi lling the bucket with a larger
4.10.6.b Cement in silos
(fi g. 35)
- Keep the drum rotating at top speed.
- Raise the bucket arm to its maximum height (3,735 mm)
- Move to underneath the unloading point of the silo.
- Calculate the quantity of cement to be loaded referring to the CONCRETE COMPOSITION AND BATCHING
TABLE in chapter 4.10.4.
- Open the unloading hatch and fi ll the drum using the silo dosage system.
4.10.7 AGGREGATE LOADING
3735
35
36
Содержание DB 260
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 22: ......
Страница 48: ...48 3 SAFETY PRECAUTIONS id DB 260 REV 00 01 07 2015 VEHICLE EXTERIOR ...
Страница 110: ......
Страница 166: ...166 TECHNICAL ANNEXES DB 260 REV 00 01 07 2015 id HYDRAULIC DIAGRAM ...
Страница 168: ......
Страница 174: ......
Страница 175: ...2013 04 08 00 02 0796 Catalog Section 78 PowerView Model PV101 C User s Guide Version3 2 ...
Страница 176: ......
Страница 183: ...00 02 0796 3 2013 04 08 Faceplate Features ...
Страница 221: ...00 02 0796 41 2013 04 08 NOTES ...
Страница 222: ...NOTES ...
Страница 223: ...NOTES ...
Страница 226: ...www fwmurphy com PV101 ...